Poppleton
POPYorkshire and The HumberManaged by Northern Trains
How this station is performing
Poppleton had 21,679 scheduled stops to Period 7 of 2026-27, about 60 a day. 75.8% of recorded arrivals were within three minutes of the timetable and 2.7% of scheduled stops were cancelled.
Poppleton opened on 30 October 1848, 178 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Poppleton is the newest; the oldest, York, opened in 1839.
The nearest stations to Poppleton are York (4.1 km south-east), Hammerton (9.2 km west), Cattal (11.5 km west), Ulleskelf (14.3 km south) and Church Fenton (17.3 km south). 2 stations lie within 10 km in all. Of the five, Ulleskelf is the most punctual at 80.0% and York the least at 70.4%, with Poppleton on 75.8%.
Poppleton is named after Upper Poppleton, a Village, home to about 2,081 people, but the station stands 0.5 km from its centre.
Poppleton improved sharply over the past year. In the latest 13 periods 75.8% of stops came within three minutes of the timetable, up 9.3 percentage points from 66.5% in the 13 before. Cancellations fell to 2.7% of scheduled stops from 3.2%, which is 0.5 percentage points fewer.
2 of 3 stations of a similar size in Yorkshire and The Humber are more punctual than Poppleton on 75.8%. The comparison group includes Cattal (76.1%), Hammerton (77.8%) and Church Fenton (74.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 21,679 | 75.8% | 2.7% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,691 | 71.3% | 2.5% |
| Period 6 of 2026-27 | 1,692 | 86.4% | 2.5% |
| Period 5 of 2026-27 | 1,692 | 83.4% | 1.8% |
| Period 4 of 2026-27 | 1,692 | 80.5% | 2.6% |
| Period 3 of 2026-27 | 1,665 | 83.6% | 6.1% |
| Period 2 of 2026-27 | 1,687 | 80.0% | 3.4% |
| Period 1 of 2026-27 | 1,938 | 84.3% | 2.3% |
| Period 13 of 2025-26 | 1,867 | 78.6% | 0.7% |
| Period 12 of 2025-26 | 1,692 | 77.1% | 1.5% |
| Period 11 of 2025-26 | 1,692 | 74.0% | 2.3% |
| Period 10 of 2025-26 | 1,548 | 68.6% | 2.6% |
| Period 9 of 2025-26 | 1,676 | 52.9% | 5.0% |
| Period 8 of 2025-26 | 1,147 | 55.3% | 1.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Cattal | 21,679 | 76.1% | 2.7% |
| Hammerton | 21,679 | 77.8% | 2.7% |
| Church Fenton | 21,983 | 74.3% | 3.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out