Hammerton
HMMYorkshire and The HumberManaged by Northern Trains
How this station is performing
Hammerton had 21,679 scheduled stops to Period 7 of 2026-27, about 60 a day. 77.8% of recorded arrivals were within three minutes of the timetable and 2.7% of scheduled stops were cancelled.
Hammerton opened on 30 October 1848, 178 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Hammerton is the newest; the oldest, York, opened in 1839.
The nearest stations to Hammerton are Cattal (2.3 km west), Poppleton (9.2 km east), Knaresborough (12.3 km west), York (13.2 km east) and Starbeck (14.2 km west). 2 stations lie within 10 km in all. At 77.8%, Hammerton is more punctual than every one of them; the best of the five, Cattal, manages 76.1%.
Hammerton improved sharply over the past year. In the latest 13 periods 77.8% of stops came within three minutes of the timetable, up 8.4 percentage points from 69.4% in the 13 before. Cancellations fell to 2.7% of scheduled stops from 3.2%, which is 0.5 percentage points fewer.
Compared with 3 stations of a similar size in Yorkshire and The Humber, Hammerton is the most punctual, at 77.8%. The comparison group includes Cattal (76.1%), Poppleton (75.8%) and Church Fenton (74.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 21,679 | 77.8% | 2.7% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,691 | 74.1% | 2.5% |
| Period 6 of 2026-27 | 1,692 | 88.2% | 2.5% |
| Period 5 of 2026-27 | 1,692 | 84.9% | 1.8% |
| Period 4 of 2026-27 | 1,692 | 83.0% | 2.6% |
| Period 3 of 2026-27 | 1,665 | 85.2% | 6.1% |
| Period 2 of 2026-27 | 1,687 | 83.9% | 3.4% |
| Period 1 of 2026-27 | 1,938 | 87.6% | 2.3% |
| Period 13 of 2025-26 | 1,867 | 81.6% | 0.7% |
| Period 12 of 2025-26 | 1,692 | 79.8% | 1.5% |
| Period 11 of 2025-26 | 1,692 | 76.0% | 2.4% |
| Period 10 of 2025-26 | 1,548 | 69.8% | 2.7% |
| Period 9 of 2025-26 | 1,676 | 51.4% | 5.0% |
| Period 8 of 2025-26 | 1,147 | 55.9% | 1.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Cattal | 21,679 | 76.1% | 2.7% |
| Poppleton | 21,679 | 75.8% | 2.7% |
| Church Fenton | 21,983 | 74.3% | 3.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out