Perry Barr
PRYWest MidlandsManaged by West Midlands Trains (West Midlands Railway)
How this station is performing
Perry Barr had 23,616 scheduled stops to Period 7 of 2026-27, about 65 a day. 91.2% of recorded arrivals were within three minutes of the timetable and 2.3% of scheduled stops were cancelled.
Perry Barr opened on 4 July 1837, 189 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Perry Barr is the oldest; the next oldest, Aston, dates from 1854.
The nearest stations to Perry Barr are Witton (West Midlands) (1.3 km east), Hamstead (Birmingham) (2.4 km north-west), Aston (2.4 km south-east), Jewellery Quarter (3.1 km south) and Gravelly Hill (3.3 km east). 36 stations lie within 10 km in all. At 91.2%, Perry Barr is more punctual than every one of them; the best of the five, Hamstead (Birmingham), manages 90.5%.
Perry Barr takes its name from a suburb called Perry Barr, home to about 23,652 people, and the station stands 1.0 km from its centre.
Across the whole run of data, the weakest four-week period for Perry Barr was Period 9 of 2024-25, at 81.2%, some time before the latest year. The strongest was Period 1 of 2025-26, at 95.7%, and the two are 14.5 percentage points apart. Cancellations peaked at 6.2% of scheduled stops in Period 11 of 2025-26, against 2.3% over the latest 13 periods.
Compared with 3 stations of a similar size in West Midlands, Perry Barr is the most punctual, at 91.2%. The comparison group includes Warwick Parkway (82.8%), Coleshill Parkway (66.2%) and Smethwick Rolfe Street (79.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 23,616 | 91.2% | 2.3% |
Operators with their own page for this station are linked to it.
Late train at Perry Barr? Delay Repay
These operators call at Perry Barr and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,817 | 90.2% | 2.1% |
| Period 6 of 2026-27 | 1,817 | 91.2% | 1.9% |
| Period 5 of 2026-27 | 1,783 | 91.7% | 3.1% |
| Period 4 of 2026-27 | 1,749 | 85.2% | 5.8% |
| Period 3 of 2026-27 | 1,622 | 91.3% | 1.8% |
| Period 2 of 2026-27 | 1,621 | 90.8% | 1.5% |
| Period 1 of 2026-27 | 2,135 | 93.1% | 1.8% |
| Period 13 of 2025-26 | 2,021 | 93.1% | 1.8% |
| Period 12 of 2025-26 | 1,848 | 94.2% | 0.5% |
| Period 11 of 2025-26 | 1,842 | 94.3% | 6.2% |
| Period 10 of 2025-26 | 1,665 | 92.8% | 1.2% |
| Period 9 of 2025-26 | 1,848 | 86.2% | 1.5% |
| Period 8 of 2025-26 | 1,848 | 90.6% | 0.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in West Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Warwick Parkway | 23,780 | 82.8% | 1.3% |
| Coleshill Parkway | 23,436 | 66.2% | 3.3% |
| Smethwick Rolfe Street | 23,816 | 79.2% | 2.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out