CrossCountry at Penzance
How this operator is doing here
CrossCountry had 1,449 scheduled stops at Penzance in the 13 periods to Period 7 of 2026-27, 6% of the station's total. 63.5% of recorded arrivals came within three minutes and 14.8% of stops were cancelled.
CrossCountry trains at Penzance also serve St Erth (8.2 km north-east, 54.1% on time, 14.4% cancelled), Hayle (10.6 km north-east, 56.5% on time, 12.9% cancelled), Camborne (19.3 km north-east, 56.6% on time, 12.9% cancelled), Redruth (25.0 km north-east, 58.9% on time, 14.1% cancelled), Truro (36.8 km north-east, 56.4% on time, 12.9% cancelled) and St Austell (58.1 km north-east, 59.5% on time, 12.2% cancelled), which are the stations on its network closest to Penzance.
The busiest CrossCountry station within 30 km of Penzance is St Erth, 8.2 km north-east, with about 4 scheduled stops a day.
Of the 2 operators with enough records at Penzance, CrossCountry is the least punctual, at 63.5%.
CrossCountry at Penzance has slipped sharply. 63.5% of stops came within three minutes of the timetable in the latest 13 periods, 9.5 percentage points worse than the 73.0% recorded in the 13 before. Cancellations rose to 14.8% of scheduled stops from 12.5%, which is 2.3 percentage points more.
Over three full railway years CrossCountry at Penzance has got worse each time, from 79.1% within three minutes in 2023-24 to 75.8% in 2024-25 and 71.8% in 2025-26.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 120 | 71.1% | 19.2% |
| Period 6 of 2026-27 | 120 | 58.8% | 15.0% |
| Period 5 of 2026-27 | 121 | 49.0% | 17.4% |
| Period 4 of 2026-27 | 120 | 53.1% | 20.0% |
| Period 3 of 2026-27 | 108 | 60.0% | 7.4% |
| Period 2 of 2026-27 | 112 | 60.8% | 13.4% |
| Period 1 of 2026-27 | 120 | 64.0% | 5.0% |
| Period 13 of 2025-26 | 114 | 73.3% | 7.9% |
| Period 12 of 2025-26 | 104 | 75.0% | 3.8% |
| Period 11 of 2025-26 | 104 | 64.6% | 24.0% |
| Period 10 of 2025-26 | 96 | 62.5% | 33.3% |
| Period 9 of 2025-26 | 94 | 59.7% | 18.1% |
| Period 8 of 2025-26 | 116 | 71.2% | 10.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Penzance
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 21,346 | 69.8% | 5.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out