Great Western Railway at Penzance
All trains at PenzanceGreat Western Railway across BritainSouth West
How this operator is doing here
Great Western Railway had 21,346 scheduled stops at Penzance in the 13 periods to Period 7 of 2026-27, 94% of the station's total. 69.8% of recorded arrivals came within three minutes and 5.3% of stops were cancelled.
Great Western Railway trains at Penzance also serve St Erth (8.2 km north-east, 80.6% on time, 3.7% cancelled), Lelant Saltings (9.0 km north-east, 97.8% on time, 1.6% cancelled), Carbis Bay (9.7 km north-east, 97.3% on time, 1.8% cancelled), Lelant (9.7 km north-east, 94.9% on time, 2.0% cancelled), St Ives (Cornwall) (10.4 km north, 96.9% on time, 1.8% cancelled) and Hayle (10.6 km north-east, 68.7% on time, 6.5% cancelled), which are the stations on its network closest to Penzance.
Within 30 km of here, Great Western Railway runs best at Carbis Bay, 9.7 km north-east (97.3%), and worst at Camborne, 19.3 km north-east (68.0%).
The busiest Great Western Railway station within 30 km of Penzance is St Erth, 8.2 km north-east, with about 104 scheduled stops a day.
Great Western Railway at Penzance has slipped sharply. 69.8% of stops came within three minutes of the timetable in the latest 13 periods, 7.2 percentage points worse than the 77.0% recorded in the 13 before. Cancellations rose to 5.3% of scheduled stops from 3.0%, which is 2.3 percentage points more.
Period by period
See how Great Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,559 | 76.9% | 1.5% |
| Period 6 of 2026-27 | 1,613 | 72.6% | 6.8% |
| Period 5 of 2026-27 | 1,662 | 58.8% | 9.4% |
| Period 4 of 2026-27 | 1,672 | 63.6% | 7.6% |
| Period 3 of 2026-27 | 1,671 | 67.1% | 6.7% |
| Period 2 of 2026-27 | 1,668 | 69.8% | 4.6% |
| Period 1 of 2026-27 | 1,915 | 76.7% | 1.8% |
| Period 13 of 2025-26 | 1,823 | 78.5% | 2.7% |
| Period 12 of 2025-26 | 1,655 | 74.9% | 2.2% |
| Period 11 of 2025-26 | 1,633 | 73.7% | 9.3% |
| Period 10 of 2025-26 | 1,471 | 64.4% | 8.9% |
| Period 9 of 2025-26 | 1,336 | 59.9% | 5.5% |
| Period 8 of 2025-26 | 1,668 | 64.6% | 3.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Penzance
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| CrossCountry | 1,449 | 63.5% | 14.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out