Penrhiwceiber
PERWalesManaged by TfW Rail
How this station is performing
Penrhiwceiber had 20,675 scheduled stops to Period 7 of 2026-27, about 57 a day. 89.6% of recorded arrivals were within three minutes of the timetable and 2.1% of scheduled stops were cancelled.
Penrhiwceiber opened on 1 June 1883 and closed to passengers on 16 March 1964. It reopened on 3 October 1988, 38 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Abercynon is the oldest (1840) and Fernhill the newest (1988), with Penrhiwceiber in between.
The nearest stations to Penrhiwceiber are Mountain Ash (1.7 km north-west), Merthyr Vale (2.4 km north-east), Quakers Yard (2.8 km east), Fernhill (3.1 km north-west) and Abercynon (3.7 km south-east). 25 stations lie within 10 km in all. At 89.6%, Penrhiwceiber is less punctual than all of them; the best of the five, Merthyr Vale, manages 96.0%.
Penrhiwceiber takes its name from a Village called Penrhiwceiber, home to about 6,265 people, and the station stands 0.1 km from its centre.
Across the whole run of data, the weakest four-week period for Penrhiwceiber was Period 2 of 2023-24, at 68.0%, some time before the latest year. The strongest was Period 13 of 2025-26, at 94.5%, and the two are 26.5 percentage points apart. Cancellations peaked at 20.8% of scheduled stops in Period 1 of 2023-24, against 2.1% over the latest 13 periods.
Compared with 3 stations of a similar size in Wales, Penrhiwceiber is the least punctual, at 89.6%. All of them are ahead, including Cwmbach (95.1%), Mountain Ash (94.3%) and Aberdare (95.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 20,675 | 89.6% | 2.1% |
Operators with their own page for this station are linked to it.
Late train at Penrhiwceiber? Delay Repay
These operators call at Penrhiwceiber and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,690 | 90.4% | 2.4% |
| Period 6 of 2026-27 | 1,710 | 89.4% | 3.0% |
| Period 5 of 2026-27 | 1,149 | 86.0% | 2.3% |
| Period 4 of 2026-27 | 1,685 | 83.9% | 1.8% |
| Period 3 of 2026-27 | 1,716 | 87.4% | 3.4% |
| Period 2 of 2026-27 | 1,711 | 91.0% | 3.0% |
| Period 1 of 2026-27 | 1,981 | 92.4% | 1.1% |
| Period 13 of 2025-26 | 1,873 | 94.5% | 0.7% |
| Period 12 of 2025-26 | 1,713 | 91.5% | 0.6% |
| Period 11 of 2025-26 | 495 | 90.0% | 1.4% |
| Period 10 of 2025-26 | 1,533 | 85.5% | 4.2% |
| Period 9 of 2025-26 | 1,711 | 87.5% | 1.6% |
| Period 8 of 2025-26 | 1,708 | 92.6% | 1.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Cwmbach | 20,675 | 95.1% | 3.0% |
| Mountain Ash | 20,676 | 94.3% | 1.9% |
| Aberdare | 20,677 | 95.9% | 2.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out