Cwmbach
CMHWalesManaged by TfW Rail
How this station is performing
Cwmbach had 20,675 scheduled stops to Period 7 of 2026-27, about 57 a day. 95.1% of recorded arrivals were within three minutes of the timetable and 3.0% of scheduled stops were cancelled.
Cwmbach opened on 13 July 1914 and closed to passengers on 15 June 1964. It reopened on 3 October 1988, 38 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Troed-y-rhiw is the oldest (1841) and Mountain Ash the newest (1988), with Cwmbach in between.
The nearest stations to Cwmbach are Fernhill (2.1 km south-east), Aberdare (2.2 km north-west), Mountain Ash (3.4 km south-east), Pentre-Bach (4.5 km north-east) and Troed-y-rhiw (4.9 km east). 19 stations lie within 10 km in all. Of the five, Pentre-Bach is the most punctual at 97.2% and Fernhill the least at 92.6%, with Cwmbach on 95.1%.
Cwmbach is one of 4 stations named after a Village called Cwmbach, home to about 5,117 people; this one stands 0.7 km from its centre.
Across the whole run of data, the weakest four-week period for Cwmbach was Period 9 of 2024-25, at 80.1%, some time before the latest year. The strongest was Period 13 of 2025-26, at 97.8%, and the two are 17.7 percentage points apart. Cancellations peaked at 21.6% of scheduled stops in Period 1 of 2023-24, against 3.0% over the latest 13 periods.
1 of 3 stations of a similar size in Wales are more punctual than Cwmbach on 95.1%. The comparison group includes Penrhiwceiber (89.6%), Mountain Ash (94.3%) and Aberdare (95.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 20,675 | 95.1% | 3.0% |
Operators with their own page for this station are linked to it.
Late train at Cwmbach? Delay Repay
These operators call at Cwmbach and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,690 | 96.0% | 2.7% |
| Period 6 of 2026-27 | 1,710 | 95.9% | 3.7% |
| Period 5 of 2026-27 | 1,149 | 93.9% | 3.0% |
| Period 4 of 2026-27 | 1,685 | 91.6% | 2.7% |
| Period 3 of 2026-27 | 1,716 | 94.4% | 4.7% |
| Period 2 of 2026-27 | 1,711 | 95.8% | 4.3% |
| Period 1 of 2026-27 | 1,981 | 96.2% | 2.1% |
| Period 13 of 2025-26 | 1,873 | 97.8% | 1.4% |
| Period 12 of 2025-26 | 1,713 | 95.8% | 1.5% |
| Period 11 of 2025-26 | 495 | 94.5% | 1.6% |
| Period 10 of 2025-26 | 1,533 | 92.4% | 5.9% |
| Period 9 of 2025-26 | 1,711 | 93.5% | 2.4% |
| Period 8 of 2025-26 | 1,708 | 96.6% | 2.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Penrhiwceiber | 20,675 | 89.6% | 2.1% |
| Mountain Ash | 20,676 | 94.3% | 1.9% |
| Aberdare | 20,677 | 95.9% | 2.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out