Aberdare
ABAWalesManaged by TfW Rail
How this station is performing
Aberdare had 20,677 scheduled stops to Period 7 of 2026-27, about 57 a day. 95.9% of recorded arrivals were within three minutes of the timetable and 2.8% of scheduled stops were cancelled.
Aberdare opened on 3 October 1988, 38 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Aberdare is the newest; the oldest, Merthyr Tydfil, opened in 1853.
The nearest stations to Aberdare are Cwmbach (2.2 km south-east), Fernhill (4.3 km south-east), Pentre-Bach (5.5 km east), Merthyr Tydfil (5.5 km north-east) and Mountain Ash (5.6 km south-east). 15 stations lie within 10 km in all. Of the five, Merthyr Tydfil is the most punctual at 98.0% and Fernhill the least at 92.6%, with Aberdare on 95.9%.
Aberdare takes its name from a town called Aberdare, home to about 14,506 people, and the station stands 0.4 km from its centre.
Aberdare is among the most punctual stations in Britain. Its 95.9% puts it 82nd out of 2,374 ranked stations, with 81 ahead of it and 2,292 behind, and 12.0 percentage points above the national median of 83.9%.
Compared with 3 stations of a similar size in Wales, Aberdare is the most punctual, at 95.9%. The comparison group includes Mountain Ash (94.3%), Cwmbach (95.1%) and Penrhiwceiber (89.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 20,677 | 95.9% | 2.8% |
Operators with their own page for this station are linked to it.
Late train at Aberdare? Delay Repay
These operators call at Aberdare and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,690 | 96.4% | 2.5% |
| Period 6 of 2026-27 | 1,710 | 96.2% | 3.5% |
| Period 5 of 2026-27 | 1,149 | 93.5% | 3.0% |
| Period 4 of 2026-27 | 1,685 | 92.8% | 2.3% |
| Period 3 of 2026-27 | 1,716 | 95.7% | 4.3% |
| Period 2 of 2026-27 | 1,713 | 96.7% | 4.1% |
| Period 1 of 2026-27 | 1,981 | 97.2% | 1.9% |
| Period 13 of 2025-26 | 1,873 | 98.1% | 1.2% |
| Period 12 of 2025-26 | 1,713 | 96.5% | 1.4% |
| Period 11 of 2025-26 | 495 | 95.7% | 1.6% |
| Period 10 of 2025-26 | 1,533 | 93.8% | 5.6% |
| Period 9 of 2025-26 | 1,711 | 94.7% | 2.4% |
| Period 8 of 2025-26 | 1,708 | 97.2% | 2.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Mountain Ash | 20,676 | 94.3% | 1.9% |
| Cwmbach | 20,675 | 95.1% | 3.0% |
| Penrhiwceiber | 20,675 | 89.6% | 2.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out