Pembrey and Burry Port
PBYWalesManaged by TfW Rail
How this station is performing
Pembrey and Burry Port has usable figures for 11 of the last 13 four-week periods to Period 7 of 2026-27, covering 21,454 scheduled stops, about 59 a day. In those periods 70.6% of stops arrived within three minutes of the timetable and 3.0% of scheduled stops were cancelled.
Pembrey and Burry Port opened on 11 October 1852, 174 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Pembrey and Burry Port is the newest; the oldest, Bynea, opened in 1850.
The nearest stations to Pembrey and Burry Port are Llanelli (6.2 km east), Kidwelly (7.3 km north-west), Bynea (10.4 km east), Llangennech (11.7 km east) and Ferryside (12.5 km north-west). 2 stations lie within 10 km in all. At 70.6%, Pembrey and Burry Port is more punctual than every one of them; the best of the five, Ferryside, manages 70.3%.
Pembrey and Burry Port is named after Pembrey, a Village, home to about 2,154 people, but the station stands 2.6 km from its centre.
2 operators call at Pembrey and Burry Port: Transport for Wales (68.6%, 78% of stops) and Great Western Railway (76.6%, 22% of stops). The operator you travel with matters: Great Western Railway reaches 76.6% within three minutes while Transport for Wales manages 68.6%, a gap of 8.0 percentage points.
Compared with 3 stations of a similar size in Wales, Pembrey and Burry Port is the least punctual, at 70.6%. All of them are ahead, including Fairwater (91.3%), Waun-gron Park (92.5%) and Danescourt (90.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 16,812 | 68.6% | 2.2% |
| Great Western Railway | 4,642 | 76.6% | 6.0% |
Operators with their own page for this station are linked to it.
Late train at Pembrey and Burry Port? Delay Repay
These operators call at Pembrey and Burry Port and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,572 | 68.5% | 3.7% |
| Period 6 of 2026-27 | 1,740 | 67.1% | 2.3% |
| Period 5 of 2026-27 | 1,705 | 62.3% | 3.6% |
| Period 4 of 2026-27 | 1,714 | 62.9% | 4.1% |
| Period 3 of 2026-27 | 1,715 | 69.0% | 3.1% |
| Period 2 of 2026-27 | 1,670 | 68.6% | 2.5% |
| Period 1 of 2026-27 | 1,933 | 74.7% | 2.8% |
| Period 13 of 2025-26 | 1,834 | 78.0% | 1.7% |
| Period 12 of 2025-26 | 1,643 | 81.7% | 1.4% |
| Period 11 of 2025-26 | 1,588 | 82.4% | 2.0% |
| Period 10 of 2025-26 | 1,486 | – | 2.7% |
| Period 9 of 2025-26 | 1,600 | – | 6.1% |
| Period 8 of 2025-26 | 1,254 | 65.2% | 4.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Fairwater | 21,532 | 91.3% | 2.2% |
| Waun-gron Park | 21,532 | 92.5% | 2.2% |
| Danescourt | 21,533 | 90.1% | 2.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out