Fairwater
FRWWalesManaged by TfW Rail
How this station is performing
Fairwater had 21,532 scheduled stops to Period 7 of 2026-27, about 59 a day. 91.3% of recorded arrivals were within three minutes of the timetable and 2.2% of scheduled stops were cancelled.
Fairwater opened on 4 October 1987, 39 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Fairwater is the newest; the oldest, Llandaf, opened in 1840.
The nearest stations to Fairwater are Waun-gron Park (0.7 km south-east), Danescourt (0.7 km north), Llandaf (1.7 km north), Radyr (2.7 km north-west) and Ninian Park (3.0 km south-east). 29 stations lie within 10 km in all. Of the five, Llandaf is the most punctual at 93.3% and Danescourt the least at 90.1%, with Fairwater on 91.3%.
Fairwater improved sharply over the past year. In the latest 13 periods 91.3% of stops came within three minutes of the timetable, up 5.3 percentage points from 86.0% in the 13 before. Cancellations fell to 2.2% of scheduled stops from 3.1%, which is 0.9 percentage points fewer.
2 of 3 stations of a similar size in Wales are more punctual than Fairwater on 91.3%. The comparison group includes Waun-gron Park (92.5%), Danescourt (90.1%) and Birchgrove (96.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 21,532 | 91.3% | 2.2% |
Operators with their own page for this station are linked to it.
Late train at Fairwater? Delay Repay
These operators call at Fairwater and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,674 | 92.8% | 3.0% |
| Period 6 of 2026-27 | 1,677 | 91.4% | 4.5% |
| Period 5 of 2026-27 | 1,686 | 90.2% | 2.4% |
| Period 4 of 2026-27 | 1,665 | 88.7% | 2.2% |
| Period 3 of 2026-27 | 1,684 | 91.5% | 3.1% |
| Period 2 of 2026-27 | 1,676 | 92.8% | 2.9% |
| Period 1 of 2026-27 | 1,942 | 93.6% | 1.7% |
| Period 13 of 2025-26 | 1,844 | 94.6% | 0.9% |
| Period 12 of 2025-26 | 1,692 | 92.4% | 1.4% |
| Period 11 of 2025-26 | 1,664 | 92.6% | 1.4% |
| Period 10 of 2025-26 | 1,513 | 87.9% | 2.6% |
| Period 9 of 2025-26 | 1,669 | 87.0% | 1.3% |
| Period 8 of 2025-26 | 1,146 | 89.6% | 1.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Waun-gron Park | 21,532 | 92.5% | 2.2% |
| Danescourt | 21,533 | 90.1% | 2.2% |
| Birchgrove | 21,563 | 96.2% | 5.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out