Great Western Railway at Pembrey and Burry Port
All trains at Pembrey and Burry PortGreat Western Railway across BritainWales
How this operator is doing here
Great Western Railway had 4,642 scheduled stops at Pembrey and Burry Port in the 13 periods to Period 7 of 2026-27, 22% of the station's total. 76.6% of recorded arrivals came within three minutes and 6.0% of stops were cancelled.
Great Western Railway trains at Pembrey and Burry Port also serve Llanelli (6.2 km east, 76.0% on time, 6.0% cancelled), Kidwelly (7.3 km north-west, – on time, – cancelled), Ferryside (12.5 km north-west, – on time, – cancelled), Carmarthen (19.2 km north, 78.5% on time, 6.0% cancelled), Swansea (22.3 km east, 64.0% on time, 2.5% cancelled) and Whitland (29.2 km north-west, – on time, – cancelled), which are the stations on its network closest to Pembrey and Burry Port.
Within 30 km of here, Great Western Railway runs best at Carmarthen, 19.2 km north (78.5%), and worst at Swansea, 22.3 km east (64.0%).
The busiest Great Western Railway station within 30 km of Pembrey and Burry Port is Swansea, 22.3 km east, with about 40 scheduled stops a day.
Of the 2 operators with enough records at Pembrey and Burry Port, Great Western Railway is the most punctual, at 76.6%.
Over three full railway years Great Western Railway at Pembrey and Burry Port has improved each time, from 69.8% within three minutes in 2023-24 to 76.5% in 2024-25 and 79.8% in 2025-26.
Period by period
See how Great Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 346 | 76.8% | 8.4% |
| Period 6 of 2026-27 | 377 | 73.4% | 7.4% |
| Period 5 of 2026-27 | 378 | 68.1% | 5.8% |
| Period 4 of 2026-27 | 377 | 71.3% | 4.5% |
| Period 3 of 2026-27 | 372 | 77.9% | 6.2% |
| Period 2 of 2026-27 | 372 | 72.3% | 4.0% |
| Period 1 of 2026-27 | 424 | 89.6% | 5.0% |
| Period 13 of 2025-26 | 402 | 83.5% | 3.5% |
| Period 12 of 2025-26 | 336 | – | 3.0% |
| Period 11 of 2025-26 | 295 | – | 2.0% |
| Period 10 of 2025-26 | 336 | – | 4.5% |
| Period 9 of 2025-26 | 347 | – | 17.0% |
| Period 8 of 2025-26 | 280 | 80.4% | 7.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Pembrey and Burry Port
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 16,812 | 68.6% | 2.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out