London Overground at Peckham Rye
All trains at Peckham RyeLondon Overground across BritainLondon
How this operator is doing here
London Overground had 49,636 scheduled stops at Peckham Rye in the 13 periods to Period 7 of 2026-27, 32% of the station's total. 90.3% of recorded arrivals came within three minutes and 4.5% of stops were cancelled.
London Overground trains at Peckham Rye also serve Queens Road (Peckham) (0.9 km north-east, 85.3% on time, 4.5% cancelled), Denmark Hill (1.4 km west, 93.4% on time, 4.5% cancelled), New Cross Gate (2.1 km east, 91.3% on time, 3.8% cancelled), Brockley (2.3 km east, 92.1% on time, 3.7% cancelled), New Cross (2.6 km east, 93.3% on time, 5.8% cancelled) and Honor Oak Park (2.7 km south-east, 92.1% on time, 3.7% cancelled), which are the stations on its network closest to Peckham Rye.
Within 30 km of here, London Overground runs best at Romford, 21.0 km north-east (99.7%), and worst at Finchley Road and Frognal, 11.9 km north-west (75.2%).
The busiest London Overground station within 30 km of Peckham Rye is Highbury and Islington, 8.8 km north, with about 593 scheduled stops a day.
London Overground ranks 2nd of the 3 operators with enough records at Peckham Rye, on 90.3%.
London Overground at Peckham Rye has slipped a little, from 93.0% within three minutes in the previous 13 periods to 90.3% in the latest 13, a fall of 2.7 percentage points. Cancellations rose to 4.5% of scheduled stops from 2.3%, which is 2.2 percentage points more.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,846 | 89.4% | 4.3% |
| Period 6 of 2026-27 | 3,302 | 89.0% | 7.5% |
| Period 5 of 2026-27 | 3,942 | 90.3% | 8.2% |
| Period 4 of 2026-27 | 3,856 | 89.0% | 6.2% |
| Period 3 of 2026-27 | 3,995 | 83.3% | 2.5% |
| Period 2 of 2026-27 | 3,707 | 88.2% | 9.5% |
| Period 1 of 2026-27 | 4,565 | 92.1% | 4.5% |
| Period 13 of 2025-26 | 3,969 | 94.0% | 3.2% |
| Period 12 of 2025-26 | 3,871 | 93.3% | 2.0% |
| Period 11 of 2025-26 | 3,980 | 92.1% | 4.0% |
| Period 10 of 2025-26 | 2,965 | 90.7% | 2.3% |
| Period 9 of 2025-26 | 3,742 | 90.6% | 2.5% |
| Period 8 of 2025-26 | 3,896 | 91.6% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Peckham Rye
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 78,939 | 91.6% | 3.2% |
| Southeastern | 25,159 | 81.3% | 2.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out