Oxshott
OXSSouth EastManaged by South Western Railway
How this station is performing
Oxshott had 23,622 scheduled stops to Period 7 of 2026-27, about 65 a day. 85.3% of recorded arrivals were within three minutes of the timetable and 3.0% of scheduled stops were cancelled.
Oxshott opened on 2 February 1885, 141 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Ashtead is the oldest (1859) and Chessington South the newest (1939), with Oxshott in between.
The nearest stations to Oxshott are Cobham and Stoke D'abernon (2.8 km south-west), Claygate (2.9 km north), Ashtead (4.3 km south-east), Chessington South (4.4 km north-east) and Hinchley Wood (4.6 km north). 38 stations lie within 10 km in all. Of the five, Chessington South is the most punctual at 87.0% and Hinchley Wood the least at 84.7%, with Oxshott on 85.3%.
Oxshott takes its name from a Village called Oxshott, home to about 4,922 people, and the station stands 0.6 km from its centre.
Across the whole run of data, the weakest four-week period for Oxshott was Period 9 of 2024-25, at 67.2%, some time before the latest year. The strongest was Period 2 of 2023-24, at 95.1%, and the two are 27.9 percentage points apart. Cancellations peaked at 6.3% of scheduled stops in Period 2 of 2026-27, against 3.0% over the latest 13 periods.
1 of 3 stations of a similar size in South East are more punctual than Oxshott on 85.3%. The comparison group includes Claygate (84.8%), Cobham and Stoke D'abernon (85.6%) and Hinchley Wood (84.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 23,622 | 85.3% | 3.0% |
Operators with their own page for this station are linked to it.
Late train at Oxshott? Delay Repay
These operators call at Oxshott and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,834 | 90.0% | 1.9% |
| Period 6 of 2026-27 | 1,780 | 88.1% | 1.7% |
| Period 5 of 2026-27 | 1,678 | 88.3% | 5.2% |
| Period 4 of 2026-27 | 1,887 | 90.4% | 1.5% |
| Period 3 of 2026-27 | 1,780 | 88.2% | 4.3% |
| Period 2 of 2026-27 | 1,827 | 84.0% | 6.3% |
| Period 1 of 2026-27 | 2,133 | 89.9% | 1.9% |
| Period 13 of 2025-26 | 1,825 | 89.9% | 1.2% |
| Period 12 of 2025-26 | 1,850 | 81.0% | 2.7% |
| Period 11 of 2025-26 | 1,854 | 85.2% | 1.6% |
| Period 10 of 2025-26 | 1,528 | 79.5% | 4.6% |
| Period 9 of 2025-26 | 1,796 | 73.7% | 2.1% |
| Period 8 of 2025-26 | 1,850 | 79.3% | 5.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Claygate | 23,622 | 84.8% | 3.0% |
| Cobham and Stoke D'abernon | 23,622 | 85.6% | 3.0% |
| Hinchley Wood | 23,622 | 84.7% | 3.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out