Oxford Parkway
OXPSouth EastManaged by Chiltern Railways
How this station is performing
Oxford Parkway had 26,222 scheduled stops to Period 7 of 2026-27, about 72 a day. 92.5% of recorded arrivals were within three minutes of the timetable and 1.4% of scheduled stops were cancelled.
Oxford Parkway opened on 26 October 2015, 11 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Oxford Parkway is the newest; the oldest, Oxford, opened in 1844.
The nearest stations to Oxford Parkway are Islip (3.6 km north-east), Oxford (5.6 km south), Hanborough (7.1 km west), Tackley (8.7 km north) and Combe (Oxon) (8.8 km west). 5 stations lie within 10 km in all. At 92.5%, Oxford Parkway is more punctual than every one of them; the best of the five, Islip, manages 92.5%.
Oxford Parkway is a parkway station, 5.9 km from the centre of Oxford, a city, home to about 147,500 people, which gives it its name.
In South East, Oxford Parkway ranks 37th of 409 ranked stations. Its 92.5% is 11.3 percentage points better than the area median of 81.2%.
1 of 3 stations of a similar size in South East are more punctual than Oxford Parkway on 92.5%. The comparison group includes Bicester Village (92.6%), Ifield (80.9%) and Longfield (78.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Chiltern Railways | 26,222 | 92.5% | 1.4% |
Operators with their own page for this station are linked to it.
Late train at Oxford Parkway? Delay Repay
These operators call at Oxford Parkway and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,011 | 92.0% | 0.9% |
| Period 6 of 2026-27 | 1,958 | 91.1% | 1.3% |
| Period 5 of 2026-27 | 2,001 | 89.5% | 2.4% |
| Period 4 of 2026-27 | 2,019 | 90.8% | 1.9% |
| Period 3 of 2026-27 | 1,840 | 91.5% | 1.8% |
| Period 2 of 2026-27 | 1,991 | 91.6% | 1.0% |
| Period 1 of 2026-27 | 2,307 | 93.2% | 1.0% |
| Period 13 of 2025-26 | 2,240 | 94.9% | 2.0% |
| Period 12 of 2025-26 | 2,006 | 94.6% | 0.1% |
| Period 11 of 2025-26 | 1,981 | 95.3% | 1.3% |
| Period 10 of 2025-26 | 1,886 | 93.5% | 0.8% |
| Period 9 of 2025-26 | 1,973 | 91.9% | 2.9% |
| Period 8 of 2025-26 | 2,009 | 92.6% | 1.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Bicester Village | 26,219 | 92.6% | 1.1% |
| Ifield | 26,271 | 80.9% | 7.0% |
| Longfield | 26,346 | 78.6% | 2.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out