Merseyrail at Ormskirk
How this operator is doing here
Merseyrail had 42,926 scheduled stops at Ormskirk in the 13 periods to Period 7 of 2026-27, 80% of the station's total. 95.3% of recorded arrivals came within three minutes and 1.5% of stops were cancelled.
Merseyrail trains at Ormskirk also serve Aughton Park (1.9 km south-west, 96.4% on time, 1.8% cancelled), Town Green (3.4 km south-west, 95.5% on time, 1.7% cancelled), Maghull North (6.5 km south-west, 95.9% on time, 1.7% cancelled), Maghull (7.8 km south-west, 92.3% on time, 1.6% cancelled), Headbolt Lane (8.7 km south, 89.2% on time, 1.8% cancelled) and Kirkby (Merseyside) (9.4 km south, 89.4% on time, 1.8% cancelled), which are the stations on its network closest to Ormskirk.
Within 30 km of here, Merseyrail runs best at Wallasey Grove Road, 20.1 km south-west (99.3%), and worst at Leasowe, 23.1 km south-west (72.4%).
The busiest Merseyrail station within 30 km of Ormskirk is Liverpool Central, 19.5 km south, with about 582 scheduled stops a day.
Of the 2 operators with enough records at Ormskirk, Merseyrail is the most punctual, at 95.3%.
For Merseyrail, Ormskirk is the 9th best of 62 ranked stations. Its 95.3% here is 3.8 percentage points above the 91.5% across the whole network.
Over three full railway years Merseyrail at Ormskirk has got worse each time, from 97.9% within three minutes in 2023-24 to 96.1% in 2024-25 and 95.2% in 2025-26.
Period by period
See how Merseyrail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,275 | 97.2% | 0.9% |
| Period 6 of 2026-27 | 3,263 | 96.8% | 1.2% |
| Period 5 of 2026-27 | 3,256 | 95.8% | 1.6% |
| Period 4 of 2026-27 | 3,205 | 95.9% | 0.8% |
| Period 3 of 2026-27 | 3,252 | 96.0% | 1.8% |
| Period 2 of 2026-27 | 3,268 | 96.9% | 0.7% |
| Period 1 of 2026-27 | 3,777 | 94.0% | 2.8% |
| Period 13 of 2025-26 | 3,583 | 97.0% | 2.0% |
| Period 12 of 2025-26 | 3,260 | 95.7% | 0.5% |
| Period 11 of 2025-26 | 3,270 | 95.1% | 1.8% |
| Period 10 of 2025-26 | 2,983 | 94.9% | 1.2% |
| Period 9 of 2025-26 | 3,257 | 93.3% | 1.5% |
| Period 8 of 2025-26 | 3,277 | 90.7% | 2.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Ormskirk
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 10,638 | 88.8% | 4.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out