Northern at Ormskirk
How this operator is doing here
Northern had 10,638 scheduled stops at Ormskirk in the 13 periods to Period 7 of 2026-27, 20% of the station's total. 88.8% of recorded arrivals came within three minutes and 4.0% of stops were cancelled.
Northern trains at Ormskirk also serve Burscough Junction (4.1 km north-east, 89.4% on time, 4.0% cancelled), New Lane (4.7 km north, 73.6% on time, 3.8% cancelled), Burscough Bridge (4.7 km north-east, 75.2% on time, 4.0% cancelled), Hoscar (5.9 km north-east, – on time, 3.8% cancelled), Bescar Lane (6.4 km north, 64.9% on time, 3.8% cancelled) and Parbold (7.7 km east, 77.7% on time, 4.0% cancelled), which are the stations on its network closest to Ormskirk.
Within 30 km of here, Northern runs best at Thatto Heath, 16.8 km south-east (90.7%), and worst at Adlington (Lancashire), 19.0 km east (56.3%).
The busiest Northern station within 30 km of Ormskirk is Preston (Lancs), 23.7 km north-east, with about 260 scheduled stops a day.
Of the 2 operators with enough records at Ormskirk, Northern is the least punctual, at 88.8%.
For Northern, Ormskirk is the 46th best of 493 ranked stations. Its 88.8% here is 10.2 percentage points above the 78.6% across the whole network.
Over three full railway years Northern at Ormskirk has got worse each time, from 93.1% within three minutes in 2023-24 to 90.8% in 2024-25 and 90.1% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 816 | 83.5% | 5.1% |
| Period 6 of 2026-27 | 816 | 91.6% | 2.7% |
| Period 5 of 2026-27 | 816 | 89.1% | 6.6% |
| Period 4 of 2026-27 | 816 | 87.8% | 2.7% |
| Period 3 of 2026-27 | 816 | 86.7% | 5.1% |
| Period 2 of 2026-27 | 816 | 91.5% | 3.9% |
| Period 1 of 2026-27 | 956 | 89.9% | 4.1% |
| Period 13 of 2025-26 | 884 | 92.6% | 2.7% |
| Period 12 of 2025-26 | 816 | 92.6% | 2.2% |
| Period 11 of 2025-26 | 816 | 92.0% | 2.0% |
| Period 10 of 2025-26 | 638 | 92.6% | 5.0% |
| Period 9 of 2025-26 | 816 | 83.1% | 5.9% |
| Period 8 of 2025-26 | 816 | 81.1% | 3.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Ormskirk
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Merseyrail | 42,926 | 95.3% | 1.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out