Ockley
OLYSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Ockley had 9,676 scheduled stops to Period 7 of 2026-27, about 27 a day. 87.6% of recorded arrivals were within three minutes of the timetable and 2.1% of scheduled stops were cancelled.
Ockley opened on 1 May 1867, 159 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Faygate is the oldest (1848) and Ifield the newest (1907), with Ockley in between.
The nearest stations to Ockley are Holmwood (3.5 km north), Warnham (6.5 km south), Faygate (8.0 km south-east), Littlehaven (8.2 km south) and Ifield (9.4 km south-east). 9 stations lie within 10 km in all. At 87.6%, Ockley is more punctual than every one of them; the best of the five, Holmwood, manages 85.4%.
Ockley takes its name from a Village called Ockley, home to about 918 people, and the station stands 1.9 km from its centre.
Ockley has slipped a little, from 90.8% within three minutes in the previous 13 periods to 87.6% in the latest 13, a fall of 3.2 percentage points. Cancellations rose to 2.1% of scheduled stops from 1.4%, which is 0.7 percentage points more.
2 of 3 stations of a similar size in South East are more punctual than Ockley on 87.6%. The comparison group includes Holmwood (85.4%), Bow Brickhill (94.8%) and Fenny Stratford (94.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 9,676 | 87.6% | 2.1% |
Operators with their own page for this station are linked to it.
Late train at Ockley? Delay Repay
These operators call at Ockley and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 808 | 81.5% | 4.5% |
| Period 6 of 2026-27 | 781 | 82.9% | 0.3% |
| Period 5 of 2026-27 | 788 | 84.8% | 2.8% |
| Period 4 of 2026-27 | 805 | 91.4% | 0.7% |
| Period 3 of 2026-27 | 797 | 88.3% | 2.1% |
| Period 2 of 2026-27 | 758 | 87.6% | 1.1% |
| Period 1 of 2026-27 | 912 | 91.0% | 0.7% |
| Period 13 of 2025-26 | 868 | 90.0% | 3.5% |
| Period 12 of 2025-26 | 404 | 88.8% | 0.2% |
| Period 11 of 2025-26 | 537 | 89.3% | 3.9% |
| Period 10 of 2025-26 | 602 | 89.4% | 0.7% |
| Period 9 of 2025-26 | 808 | 87.4% | 2.4% |
| Period 8 of 2025-26 | 808 | 87.3% | 3.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Holmwood | 9,676 | 85.4% | 2.1% |
| Bow Brickhill | 10,295 | 94.8% | 7.3% |
| Fenny Stratford | 10,295 | 94.6% | 7.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out