Oakleigh Park
OKLLondonManaged by Govia Thameslink Railway (Great Northern)
How this station is performing
Oakleigh Park had 38,731 scheduled stops to Period 7 of 2026-27, about 106 a day. 89.1% of recorded arrivals were within three minutes of the timetable and 4.8% of scheduled stops were cancelled.
Oakleigh Park opened on 1 December 1873, 153 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, New Barnet is the oldest (1850) and Hadley Wood the newest (1885), with Oakleigh Park in between.
The nearest stations to Oakleigh Park are New Barnet (1.3 km north), New Southgate (3.1 km south-east), Hadley Wood (3.5 km north), Palmers Green (4.4 km south-east) and Winchmore Hill (4.5 km east). 45 stations lie within 10 km in all. Of the five, Winchmore Hill is the most punctual at 91.3% and New Barnet the least at 86.8%, with Oakleigh Park on 89.1%.
Oakleigh Park takes its name from an area of London called Oakleigh Park, and the station stands 1.3 km from its centre.
1 of 3 stations of a similar size in London are more punctual than Oakleigh Park on 89.1%. The comparison group includes New Southgate (88.7%), Northumberland Park (94.4%) and Enfield Lock (86.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 38,731 | 89.1% | 4.8% |
Operators with their own page for this station are linked to it.
Late train at Oakleigh Park? Delay Repay
These operators call at Oakleigh Park and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,014 | 86.8% | 4.3% |
| Period 6 of 2026-27 | 2,949 | 85.3% | 8.9% |
| Period 5 of 2026-27 | 2,985 | 89.7% | 5.4% |
| Period 4 of 2026-27 | 3,012 | 88.5% | 5.0% |
| Period 3 of 2026-27 | 2,951 | 90.0% | 6.1% |
| Period 2 of 2026-27 | 2,908 | 90.8% | 6.6% |
| Period 1 of 2026-27 | 3,367 | 91.5% | 3.1% |
| Period 13 of 2025-26 | 3,299 | 90.8% | 2.7% |
| Period 12 of 2025-26 | 2,770 | 90.9% | 2.3% |
| Period 11 of 2025-26 | 2,786 | 89.9% | 4.6% |
| Period 10 of 2025-26 | 2,410 | 90.8% | 4.2% |
| Period 9 of 2025-26 | 3,134 | 83.9% | 5.4% |
| Period 8 of 2025-26 | 3,146 | 89.0% | 3.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| New Southgate | 38,726 | 88.7% | 4.7% |
| Northumberland Park | 38,899 | 94.4% | 3.9% |
| Enfield Lock | 38,449 | 86.5% | 2.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out