Enfield Lock
ENLLondonManaged by Greater Anglia
How this station is performing
Enfield Lock had 38,449 scheduled stops to Period 7 of 2026-27, about 106 a day. 86.5% of recorded arrivals were within three minutes of the timetable and 2.8% of scheduled stops were cancelled.
Enfield Lock opened on 2 April 1855, 171 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Waltham Cross is the oldest (1840) and Southbury the newest (1891), with Enfield Lock in between.
The nearest stations to Enfield Lock are Turkey Street (1.3 km west), Waltham Cross (1.6 km north), Brimsdown (1.7 km south), Theobalds Grove (2.4 km north) and Southbury (3.0 km south-west). 32 stations lie within 10 km in all. Of the five, Southbury is the most punctual at 93.4% and Brimsdown the least at 86.4%, with Enfield Lock on 86.5%.
Enfield Lock takes its name from an area of London called Enfield Lock, home to about 16,469 people, and the station stands 0.3 km from its centre.
Compared with 3 stations of a similar size in London, Enfield Lock is the least punctual, at 86.5%. All of them are ahead, including New Southgate (88.7%), Oakleigh Park (89.1%) and Northumberland Park (94.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Greater Anglia | 38,449 | 86.5% | 2.8% |
Operators with their own page for this station are linked to it.
Late train at Enfield Lock? Delay Repay
These operators call at Enfield Lock and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,976 | 86.8% | 2.1% |
| Period 6 of 2026-27 | 2,991 | 84.1% | 2.2% |
| Period 5 of 2026-27 | 3,011 | 82.3% | 4.7% |
| Period 4 of 2026-27 | 2,849 | 84.8% | 2.7% |
| Period 3 of 2026-27 | 2,934 | 84.2% | 3.7% |
| Period 2 of 2026-27 | 2,576 | 90.8% | 2.3% |
| Period 1 of 2026-27 | 3,375 | 89.9% | 3.1% |
| Period 13 of 2025-26 | 3,347 | 85.8% | 2.1% |
| Period 12 of 2025-26 | 3,017 | 85.9% | 3.7% |
| Period 11 of 2025-26 | 2,989 | 89.0% | 1.2% |
| Period 10 of 2025-26 | 2,442 | 89.6% | 1.9% |
| Period 9 of 2025-26 | 2,977 | 84.3% | 2.6% |
| Period 8 of 2025-26 | 2,965 | 87.7% | 4.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| New Southgate | 38,726 | 88.7% | 4.7% |
| Oakleigh Park | 38,731 | 89.1% | 4.8% |
| Northumberland Park | 38,899 | 94.4% | 3.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out