CrossCountry at Nuneaton
All trains at NuneatonCrossCountry across BritainWest Midlands
How this operator is doing here
CrossCountry had 23,326 scheduled stops at Nuneaton in the 13 periods to Period 7 of 2026-27, 38% of the station's total. 64.1% of recorded arrivals came within three minutes and 3.2% of stops were cancelled.
CrossCountry trains at Nuneaton also serve Hinckley (Leics) (6.4 km east, 72.8% on time, 3.0% cancelled), Coventry (14.4 km south, 54.6% on time, 4.8% cancelled), Coleshill Parkway (16.5 km west, 66.2% on time, 3.3% cancelled), Wilnecote (Staffs) (17.3 km north-west, 74.1% on time, 6.4% cancelled), Narborough (18.3 km east, 73.3% on time, 2.8% cancelled) and Water Orton (18.9 km west, 66.2% on time, 4.3% cancelled), which are the stations on its network closest to Nuneaton.
Within 30 km of here, CrossCountry runs best at Wilnecote (Staffs), 17.3 km north-west (74.1%), and worst at Birmingham International, 19.6 km south-west (52.1%).
The busiest CrossCountry station within 30 km of Nuneaton is Birmingham New Street, 29.9 km west, with about 237 scheduled stops a day.
CrossCountry ranks 2nd of the 4 operators with enough records at Nuneaton, on 64.1%.
CrossCountry at Nuneaton has slipped a little, from 68.1% within three minutes in the previous 13 periods to 64.1% in the latest 13, a fall of 4.0 percentage points. Cancellations held steady at 3.2% of scheduled stops, against 3.3% before.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,757 | 58.3% | 3.1% |
| Period 6 of 2026-27 | 1,693 | 53.9% | 2.5% |
| Period 5 of 2026-27 | 1,791 | 58.4% | 3.2% |
| Period 4 of 2026-27 | 1,824 | 55.3% | 2.4% |
| Period 3 of 2026-27 | 1,598 | 58.7% | 4.1% |
| Period 2 of 2026-27 | 1,822 | 65.5% | 2.7% |
| Period 1 of 2026-27 | 2,107 | 72.5% | 2.6% |
| Period 13 of 2025-26 | 2,029 | 75.1% | 3.4% |
| Period 12 of 2025-26 | 1,798 | 74.2% | 1.3% |
| Period 11 of 2025-26 | 1,790 | 71.5% | 4.0% |
| Period 10 of 2025-26 | 1,572 | 66.8% | 5.2% |
| Period 9 of 2025-26 | 1,779 | 56.9% | 4.5% |
| Period 8 of 2025-26 | 1,766 | 62.8% | 2.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Nuneaton
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 24,387 | 70.4% | 5.6% |
| Avanti | 12,454 | 50.1% | 8.0% |
| Lumo (West Coast) | 729 | 52.4% | 4.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out