Avanti at Nuneaton
How this operator is doing here
Avanti had 12,454 scheduled stops at Nuneaton in the 13 periods to Period 7 of 2026-27, 20% of the station's total. 50.1% of recorded arrivals came within three minutes and 8.0% of stops were cancelled.
Avanti trains at Nuneaton also serve Coventry (14.4 km south, 53.5% on time, 7.7% cancelled), Tamworth (19.4 km north-west, 45.6% on time, 8.2% cancelled), Birmingham International (19.6 km south-west, 56.8% on time, 8.5% cancelled), Rugby (21.9 km south-east, 55.6% on time, 4.8% cancelled), Lichfield Trent Valley (28.8 km north-west, 45.5% on time, 8.1% cancelled) and Birmingham New Street (29.9 km west, 53.6% on time, 9.2% cancelled), which are the stations on its network closest to Nuneaton.
Within 30 km of here, Avanti runs best at Birmingham International, 19.6 km south-west (56.8%), and worst at Lichfield Trent Valley, 28.8 km north-west (45.5%).
The busiest Avanti station within 30 km of Nuneaton is Birmingham New Street, 29.9 km west, with about 89 scheduled stops a day.
Of the 4 operators with enough records at Nuneaton, Avanti is the least punctual, at 50.1%.
Avanti at Nuneaton has slipped a little, from 53.1% within three minutes in the previous 13 periods to 50.1% in the latest 13, a fall of 3.0 percentage points. Cancellations rose to 8.0% of scheduled stops from 6.8%, which is 1.2 percentage points more.
Period by period
See how Avanti Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 876 | 51.2% | 3.5% |
| Period 6 of 2026-27 | 962 | 41.9% | 4.2% |
| Period 5 of 2026-27 | 944 | 45.7% | 9.6% |
| Period 4 of 2026-27 | 962 | 38.4% | 15.8% |
| Period 3 of 2026-27 | 866 | 45.0% | 9.6% |
| Period 2 of 2026-27 | 962 | 50.1% | 9.8% |
| Period 1 of 2026-27 | 1,074 | 60.8% | 6.4% |
| Period 13 of 2025-26 | 1,061 | 60.0% | 4.0% |
| Period 12 of 2025-26 | 976 | 56.5% | 6.0% |
| Period 11 of 2025-26 | 939 | 53.7% | 10.3% |
| Period 10 of 2025-26 | 872 | 56.3% | 5.8% |
| Period 9 of 2025-26 | 980 | 40.2% | 11.6% |
| Period 8 of 2025-26 | 980 | 47.5% | 7.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Nuneaton
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 24,387 | 70.4% | 5.6% |
| CrossCountry | 23,326 | 64.1% | 3.2% |
| Lumo (West Coast) | 729 | 52.4% | 4.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out