CrossCountry at Nottingham
All trains at NottinghamCrossCountry across BritainEast Midlands
How this operator is doing here
CrossCountry had 19,935 scheduled stops at Nottingham in the 13 periods to Period 7 of 2026-27, 15% of the station's total. 79.7% of recorded arrivals came within three minutes and 8.1% of stops were cancelled.
CrossCountry trains at Nottingham also serve Beeston (5.1 km south-west, 75.5% on time, 7.3% cancelled), Attenborough (7.4 km south-west, 90.8% on time, 5.8% cancelled), Long Eaton (11.8 km south-west, 72.2% on time, 7.5% cancelled), Spondon (18.2 km west, 83.7% on time, 5.3% cancelled), Derby (21.6 km west, 65.0% on time, 5.4% cancelled) and Melton Mowbray (27.1 km south-east, 63.9% on time, 3.3% cancelled), which are the stations on its network closest to Nottingham.
Within 30 km of here, CrossCountry runs best at Beeston, 5.1 km south-west (75.5%), and worst at Melton Mowbray, 27.1 km south-east (63.9%).
The busiest CrossCountry station within 30 km of Nottingham is Derby, 21.6 km west, with about 103 scheduled stops a day.
Of the 3 operators with enough records at Nottingham, CrossCountry is the most punctual, at 79.7%.
For CrossCountry, Nottingham is the 4th best of 99 ranked stations. Its 79.7% here is 16.5 percentage points above the 63.2% across the whole network.
Cancellations of CrossCountry at Nottingham are near its usual level: 8.1% of scheduled stops, against 5.9% across its network and 3.7% for every operator at the station.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,564 | 78.2% | 6.6% |
| Period 6 of 2026-27 | 1,504 | 78.6% | 7.4% |
| Period 5 of 2026-27 | 1,555 | 80.0% | 5.0% |
| Period 4 of 2026-27 | 1,400 | 75.9% | 8.4% |
| Period 3 of 2026-27 | 1,507 | 78.9% | 10.7% |
| Period 2 of 2026-27 | 1,542 | 80.1% | 12.8% |
| Period 1 of 2026-27 | 1,774 | 81.5% | 5.5% |
| Period 13 of 2025-26 | 1,657 | 82.4% | 6.8% |
| Period 12 of 2025-26 | 1,523 | 85.0% | 3.1% |
| Period 11 of 2025-26 | 1,485 | 86.5% | 6.1% |
| Period 10 of 2025-26 | 1,355 | 80.9% | 16.5% |
| Period 9 of 2025-26 | 1,560 | 71.7% | 10.8% |
| Period 8 of 2025-26 | 1,509 | 75.3% | 7.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Nottingham
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 100,355 | 76.9% | 3.0% |
| Northern | 12,472 | 76.6% | 2.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out