Northern at Nottingham
All trains at NottinghamNorthern across BritainEast Midlands
How this operator is doing here
Northern had 12,472 scheduled stops at Nottingham in the 13 periods to Period 7 of 2026-27, 9% of the station's total. 76.6% of recorded arrivals came within three minutes and 2.1% of stops were cancelled.
Northern trains at Nottingham also serve Ilkeston (10.7 km west, 73.2% on time, 2.2% cancelled), Langley Mill (14.7 km north-west, 75.3% on time, 2.2% cancelled), Alfreton (22.8 km north-west, 78.1% on time, 2.1% cancelled), Chesterfield (37.2 km north-west, 79.1% on time, 1.9% cancelled), Worksop (40.5 km north, 81.4% on time, 2.0% cancelled) and Shireoaks (42.0 km north, 82.5% on time, 2.0% cancelled), which are the stations on its network closest to Nottingham.
Within 30 km of here, Northern runs best at Alfreton, 22.8 km north-west (78.1%), and worst at Ilkeston, 10.7 km west (73.2%).
The busiest Northern station within 30 km of Nottingham is Alfreton, 22.8 km north-west, with about 34 scheduled stops a day.
Of the 3 operators with enough records at Nottingham, Northern is the least punctual, at 76.6%.
For Northern, Nottingham is the 320th best of 493 ranked stations. Its 76.6% here is 2.0 percentage points below the 78.6% across the whole network.
Northern at Nottingham has slipped a little, from 78.7% within three minutes in the previous 13 periods to 76.6% in the latest 13, a fall of 2.1 percentage points. Cancellations fell to 2.1% of scheduled stops from 3.6%, which is 1.5 percentage points fewer.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 968 | 81.0% | 1.4% |
| Period 6 of 2026-27 | 935 | 77.0% | 1.3% |
| Period 5 of 2026-27 | 810 | 76.4% | 1.5% |
| Period 4 of 2026-27 | 966 | 77.8% | 3.7% |
| Period 3 of 2026-27 | 969 | 73.9% | 2.9% |
| Period 2 of 2026-27 | 972 | 74.5% | 2.7% |
| Period 1 of 2026-27 | 1,108 | 80.8% | 1.1% |
| Period 13 of 2025-26 | 1,000 | 78.5% | 2.5% |
| Period 12 of 2025-26 | 964 | 78.7% | 1.2% |
| Period 11 of 2025-26 | 962 | 79.9% | 1.7% |
| Period 10 of 2025-26 | 882 | 75.0% | 1.6% |
| Period 9 of 2025-26 | 964 | 64.7% | 3.7% |
| Period 8 of 2025-26 | 972 | 76.7% | 2.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Nottingham
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 100,355 | 76.9% | 3.0% |
| CrossCountry | 19,935 | 79.7% | 8.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out