New Beckenham
NBCLondonManaged by Southeastern
How this station is performing
New Beckenham had 47,715 scheduled stops to Period 7 of 2026-27, about 131 a day. 93.5% of recorded arrivals were within three minutes of the timetable and 1.1% of scheduled stops were cancelled.
New Beckenham opened on 1 April 1864, 162 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Lower Sydenham is the oldest (1857) and Clock House the newest (1890), with New Beckenham in between.
The nearest stations to New Beckenham are Kent House (0.9 km south-west), Lower Sydenham (0.9 km north), Beckenham Junction (0.9 km south-east), Clock House (1.0 km south) and Penge East (1.3 km west). 95 stations lie within 10 km in all. Of the five, Clock House is the most punctual at 94.4% and Penge East the least at 84.5%, with New Beckenham on 93.5%.
Across the whole run of data, the weakest four-week period for New Beckenham was Period 9 of 2024-25, at 80.3%, some time before the latest year. The strongest was Period 3 of 2025-26, at 95.9%, and the two are 15.6 percentage points apart.
1 of 3 stations of a similar size in London are more punctual than New Beckenham on 93.5%. The comparison group includes Lower Sydenham (93.7%), Catford Bridge (93.1%) and Ladywell (93.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 47,715 | 93.5% | 1.1% |
Operators with their own page for this station are linked to it.
Late train at New Beckenham? Delay Repay
These operators call at New Beckenham and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,535 | 92.5% | 1.4% |
| Period 6 of 2026-27 | 3,314 | 93.2% | 0.8% |
| Period 5 of 2026-27 | 3,762 | 93.6% | 2.1% |
| Period 4 of 2026-27 | 3,746 | 95.2% | 1.3% |
| Period 3 of 2026-27 | 3,607 | 91.8% | 2.3% |
| Period 2 of 2026-27 | 3,533 | 92.0% | 1.0% |
| Period 1 of 2026-27 | 4,187 | 94.8% | 0.6% |
| Period 13 of 2025-26 | 4,092 | 94.8% | 1.1% |
| Period 12 of 2025-26 | 3,744 | 93.4% | 1.1% |
| Period 11 of 2025-26 | 3,604 | 94.3% | 0.6% |
| Period 10 of 2025-26 | 3,318 | 93.2% | 0.8% |
| Period 9 of 2025-26 | 3,533 | 92.7% | 1.1% |
| Period 8 of 2025-26 | 3,740 | 93.8% | 0.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Lower Sydenham | 47,711 | 93.7% | 1.2% |
| Catford Bridge | 47,710 | 93.1% | 1.1% |
| Ladywell | 47,683 | 93.0% | 1.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out