Lumo (East Coast) had 3,963 scheduled stops at Newcastle in the 13 periods to Period 7 of 2026-27, 3% of the station's total. 58.8% of recorded arrivals came within three minutes and 1.0% of stops were cancelled.
Lumo (East Coast) trains at Newcastle also serve Morpeth (22.0 km north, 57.8% on time, 1.0% cancelled), Alnmouth (47.2 km north, – on time, – cancelled), York (117.3 km south, – on time, – cancelled), Edinburgh (147.7 km north-west, 68.3% on time, 2.2% cancelled), Haymarket (148.4 km north-west, 80.6% on time, 17.8% cancelled) and Doncaster (163.8 km south, – on time, – cancelled), which are the stations on its network closest to Newcastle.
The busiest Lumo (East Coast) station within 30 km of Newcastle is Morpeth, 22.0 km north, with about 9 scheduled stops a day.
Of the 5 operators with enough records at Newcastle, Lumo (East Coast) is the least punctual, at 58.8%.
For Lumo (East Coast), Newcastle is the 7th best of 8 ranked stations. Its 58.8% here is 7.9 percentage points below the 66.7% across the whole network.
Lumo (East Coast) at Newcastle has slipped sharply. 58.8% of stops came within three minutes of the timetable in the latest 13 periods, 10.9 percentage points worse than the 69.7% recorded in the 13 before. Cancellations held steady at 1.0% of scheduled stops, against 1.2% before.
Period by period
See how Lumo (East Coast) Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 316 | 53.8% | 1.3% |
| Period 6 of 2026-27 | 315 | 56.4% | 1.0% |
| Period 5 of 2026-27 | 325 | 55.0% | 0.9% |
| Period 4 of 2026-27 | 328 | 52.1% | 0.0% |
| Period 3 of 2026-27 | 324 | 57.6% | 0.3% |
| Period 2 of 2026-27 | 291 | 57.1% | 0.7% |
| Period 1 of 2026-27 | 367 | 55.6% | 1.1% |
| Period 13 of 2025-26 | 308 | 68.1% | 2.3% |
| Period 12 of 2025-26 | 291 | 69.8% | 2.1% |
| Period 11 of 2025-26 | 312 | 62.8% | 1.0% |
| Period 10 of 2025-26 | 285 | 62.1% | 1.1% |
| Period 9 of 2025-26 | 250 | 56.9% | 1.6% |
| Period 8 of 2025-26 | 251 | 59.4% | 0.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Newcastle
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 75,597 | 84.1% | 2.4% |
| LNER | 33,569 | 63.7% | 2.3% |
| TransPennine Express | 17,887 | 77.1% | 2.0% |
| CrossCountry | 14,093 | 65.1% | 3.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out