Newbridge
NBEWalesManaged by TfW Rail
How this station is performing
Newbridge had 20,016 scheduled stops to Period 7 of 2026-27, about 55 a day. 87.2% of recorded arrivals were within three minutes of the timetable and 3.9% of scheduled stops were cancelled.
Newbridge opened on 23 December 1850 and closed to passengers on 30 April 1962. It reopened on 6 February 2008, 18 years before the latest figures. Of the 5 stations nearest to it with a known opening date, Newbridge is the oldest; the next oldest, Crosskeys, dates from 1851.
The nearest stations to Newbridge are Llanhilleth (3.9 km north), Crosskeys (5.1 km south), Pengam (6.0 km west), Hengoed (6.0 km west) and Gilfach Fargoed (6.2 km west). 14 stations lie within 10 km in all. Of the five, Hengoed is the most punctual at 90.1% and Gilfach Fargoed the least at 85.7%, with Newbridge on 87.2%.
Newbridge is one of 14 stations named after a town called Newbridge, home to about 6,509 people; this one stands 0.7 km from its centre.
Across the whole run of data, the weakest four-week period for Newbridge was Period 9 of 2023-24, at 56.6%, some time before the latest year. The strongest was Period 2 of 2024-25, at 92.8%, and the two are 36.2 percentage points apart. Cancellations peaked at 12.7% of scheduled stops in Period 9 of 2023-24, against 3.9% over the latest 13 periods.
1 of 3 stations of a similar size in Wales are more punctual than Newbridge on 87.2%. The comparison group includes Crosskeys (86.9%), Deganwy (89.0%) and Ebbw Vale Parkway (86.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 20,016 | 87.2% | 3.9% |
Operators with their own page for this station are linked to it.
Late train at Newbridge? Delay Repay
These operators call at Newbridge and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,595 | 86.0% | 0.8% |
| Period 6 of 2026-27 | 1,428 | 88.8% | 2.1% |
| Period 5 of 2026-27 | 1,446 | 82.9% | 8.8% |
| Period 4 of 2026-27 | 1,357 | 80.4% | 8.3% |
| Period 3 of 2026-27 | 1,485 | 87.8% | 2.2% |
| Period 2 of 2026-27 | 1,594 | 89.0% | 6.1% |
| Period 1 of 2026-27 | 1,808 | 90.6% | 6.3% |
| Period 13 of 2025-26 | 1,703 | 92.0% | 1.1% |
| Period 12 of 2025-26 | 1,566 | 89.6% | 3.3% |
| Period 11 of 2025-26 | 1,486 | 92.2% | 3.0% |
| Period 10 of 2025-26 | 1,360 | 83.9% | 1.8% |
| Period 9 of 2025-26 | 1,608 | 81.2% | 4.1% |
| Period 8 of 2025-26 | 1,580 | 87.3% | 2.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Crosskeys | 20,016 | 86.9% | 3.9% |
| Deganwy | 20,016 | 89.0% | 2.9% |
| Ebbw Vale Parkway | 20,016 | 86.7% | 4.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out