LNER at Newark Northgate
All trains at Newark NorthgateLNER across BritainEast Midlands
How this operator is doing here
LNER had 29,533 scheduled stops at Newark Northgate in the 13 periods to Period 7 of 2026-27, 88% of the station's total. 65.8% of recorded arrivals came within three minutes and 2.9% of stops were cancelled.
LNER trains at Newark Northgate also serve Grantham (22.1 km south-east, 62.1% on time, 3.0% cancelled), Lincoln (23.6 km north-east, 89.5% on time, 5.9% cancelled), Retford (27.6 km north, 72.6% on time, 3.5% cancelled), Doncaster (54.0 km north-west, 66.0% on time, 2.8% cancelled), Peterborough (67.4 km south-east, 65.9% on time, 2.8% cancelled) and Brough (73.3 km north, 69.0% on time, 5.6% cancelled), which are the stations on its network closest to Newark Northgate.
Within 30 km of here, LNER runs best at Lincoln, 23.6 km north-east (89.5%), and worst at Grantham, 22.1 km south-east (62.1%).
The busiest LNER station within 30 km of Newark Northgate is Grantham, 22.1 km south-east, with about 77 scheduled stops a day.
LNER at Newark Northgate has slipped sharply. 65.8% of stops came within three minutes of the timetable in the latest 13 periods, 6.9 percentage points worse than the 72.7% recorded in the 13 before. Cancellations rose to 2.9% of scheduled stops from 1.7%, which is 1.2 percentage points more.
Period by period
See how LNER Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,333 | 67.4% | 1.4% |
| Period 6 of 2026-27 | 2,367 | 62.4% | 3.2% |
| Period 5 of 2026-27 | 2,407 | 60.5% | 4.1% |
| Period 4 of 2026-27 | 2,410 | 63.2% | 2.3% |
| Period 3 of 2026-27 | 2,341 | 62.1% | 2.0% |
| Period 2 of 2026-27 | 2,375 | 63.4% | 3.4% |
| Period 1 of 2026-27 | 2,758 | 64.2% | 4.9% |
| Period 13 of 2025-26 | 2,422 | 70.6% | 2.3% |
| Period 12 of 2025-26 | 2,237 | 68.5% | 2.6% |
| Period 11 of 2025-26 | 2,263 | 66.5% | 3.4% |
| Period 10 of 2025-26 | 1,977 | 66.1% | 2.1% |
| Period 9 of 2025-26 | 1,810 | 68.7% | 3.4% |
| Period 8 of 2025-26 | 1,833 | 74.4% | 1.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Newark Northgate
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 4,113 | 92.4% | 2.5% |
| Grand Central | 3 | – | – |
| Hull Trains | 1 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out