East Midlands Railway at Newark Northgate
All trains at Newark NorthgateEast Midlands Railway across BritainEast Midlands
How this operator is doing here
East Midlands Railway had 4,113 scheduled stops at Newark Northgate in the 13 periods to Period 7 of 2026-27, 12% of the station's total. 92.4% of recorded arrivals came within three minutes and 2.5% of stops were cancelled.
East Midlands Railway trains at Newark Northgate also serve Newark Castle (0.9 km west, 85.1% on time, 2.0% cancelled), Rolleston (6.9 km west, 82.3% on time, 2.6% cancelled), Collingham (7.7 km north-east, 84.9% on time, 2.1% cancelled), Fiskerton (7.9 km west, 83.2% on time, 2.5% cancelled), Bleasby (10.6 km south-west, 82.7% on time, 2.6% cancelled) and Swinderby (11.7 km north-east, 88.3% on time, 2.1% cancelled), which are the stations on its network closest to Newark Northgate.
Within 30 km of here, East Midlands Railway runs best at Saxilby, 22.5 km north-east (88.8%), and worst at Grantham, 22.1 km south-east (68.4%).
The busiest East Midlands Railway station within 30 km of Newark Northgate is Nottingham, 27.5 km south-west, with about 276 scheduled stops a day.
Of the 2 operators with enough records at Newark Northgate, East Midlands Railway is the most punctual, at 92.4%.
Newark Northgate is the most punctual station on the East Midlands Railway network, out of 114 ranked stations: 92.4% here against 74.6% across the whole network, which is 17.8 percentage points better.
Period by period
See how East Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 302 | 94.3% | 0.7% |
| Period 6 of 2026-27 | 296 | 96.3% | 0.0% |
| Period 5 of 2026-27 | 296 | 92.4% | 2.4% |
| Period 4 of 2026-27 | 300 | 93.9% | 2.3% |
| Period 3 of 2026-27 | 296 | 92.9% | 5.1% |
| Period 2 of 2026-27 | 296 | 92.3% | 3.7% |
| Period 1 of 2026-27 | 339 | 92.5% | 2.1% |
| Period 13 of 2025-26 | 332 | 97.2% | 4.2% |
| Period 12 of 2025-26 | 295 | 91.4% | 1.4% |
| Period 11 of 2025-26 | 295 | 94.7% | 3.4% |
| Period 10 of 2025-26 | 298 | 94.2% | 2.3% |
| Period 9 of 2025-26 | 384 | 83.7% | 0.8% |
| Period 8 of 2025-26 | 384 | 88.1% | 3.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Newark Northgate
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| LNER | 29,533 | 65.8% | 2.9% |
| Grand Central | 3 | – | – |
| Hull Trains | 1 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out