New Barnet
NBALondonManaged by Govia Thameslink Railway (Great Northern)
How this station is performing
New Barnet had 41,152 scheduled stops to Period 7 of 2026-27, about 113 a day. 86.8% of recorded arrivals were within three minutes of the timetable and 4.8% of scheduled stops were cancelled.
New Barnet opened on 7 August 1850, 176 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, New Barnet is the oldest; the next oldest, New Southgate, dates from 1850.
The nearest stations to New Barnet are Oakleigh Park (1.3 km south), Hadley Wood (2.2 km north), New Southgate (4.4 km south-east), Winchmore Hill (5.2 km east) and Grange Park (5.3 km east). 36 stations lie within 10 km in all. At 86.8%, New Barnet is less punctual than all of them; the best of the five, Grange Park, manages 91.7%.
New Barnet takes its name from an area of London called New Barnet, and the station stands 0.5 km from its centre.
Across the whole run of data, the weakest four-week period for New Barnet was Period 9 of 2024-25, at 76.3%, some time before the latest year. The strongest was Period 1 of 2023-24, at 90.4%, and the two are 14.1 percentage points apart.
2 of 3 stations of a similar size in London are more punctual than New Barnet on 86.8%. The comparison group includes Northumberland Park (94.4%), Brixton (84.3%) and Oakleigh Park (89.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 41,152 | 86.8% | 4.8% |
Operators with their own page for this station are linked to it.
Late train at New Barnet? Delay Repay
These operators call at New Barnet and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,249 | 83.7% | 4.6% |
| Period 6 of 2026-27 | 3,153 | 82.5% | 9.0% |
| Period 5 of 2026-27 | 3,185 | 87.5% | 5.4% |
| Period 4 of 2026-27 | 3,244 | 86.4% | 5.0% |
| Period 3 of 2026-27 | 3,171 | 88.4% | 6.3% |
| Period 2 of 2026-27 | 3,107 | 88.7% | 6.7% |
| Period 1 of 2026-27 | 3,610 | 90.0% | 2.9% |
| Period 13 of 2025-26 | 3,611 | 89.3% | 2.9% |
| Period 12 of 2025-26 | 3,054 | 88.9% | 2.5% |
| Period 11 of 2025-26 | 2,986 | 87.2% | 4.6% |
| Period 10 of 2025-26 | 2,475 | 89.3% | 4.3% |
| Period 9 of 2025-26 | 3,134 | 80.6% | 5.4% |
| Period 8 of 2025-26 | 3,173 | 85.6% | 3.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northumberland Park | 38,899 | 94.4% | 3.9% |
| Brixton | 43,684 | 84.3% | 2.8% |
| Oakleigh Park | 38,731 | 89.1% | 4.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out