Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

GTR at Netley

All trains at NetleyGTR across BritainSouth East

On time, last 13 periods–Whole station: 79.2%
Cancelled–Whole station: 2.3%
Scheduled stops490Of 14,729 at the station

How this operator is doing here

There are not enough usable records of GTR at Netley to report how punctual it is.

Period by period

70%80%90%100%2023-242024-252025-262026-27Period 1 of 2023-24: 88.8%Period 2 of 2023-24: 94.6%Period 3 of 2023-24: 95.3%Period 4 of 2023-24: 80.0%Period 5 of 2023-24: 83.5%Period 6 of 2023-24: 90.7%Period 7 of 2023-24: 89.9%Period 8 of 2023-24: 78.9%Period 9 of 2023-24: 73.2%Period 10 of 2023-24: 82.6%Period 11 of 2023-24: 82.0%Period 12 of 2023-24: 83.3%Period 13 of 2023-24: 80.2%Period 1 of 2024-25: 81.3%Period 2 of 2024-25: 90.7%
This pageGreat Britain
0%5%10%15%Period 1 of 2023-24: 8.2%Period 2 of 2023-24: 6.3%Period 3 of 2023-24: 3.4%Period 4 of 2023-24: 14.3%Period 5 of 2023-24: 2.5%Period 6 of 2023-24: 7.5%Period 7 of 2023-24: 9.2%Period 8 of 2023-24: 10.0%Period 9 of 2023-24: 4.7%Period 10 of 2023-24: 6.8%Period 11 of 2023-24: 2.2%Period 12 of 2023-24: 12.0%Period 13 of 2023-24: 2.0%Period 1 of 2024-25: 13.6%Period 2 of 2024-25: 1.1%2023-242024-252025-262026-27

See how GTR Delay Repay works

The last 13 periods

Other operators at Netley

OperatorScheduled stopsWithin 3 minCancelled
South Western Railway14,23979.4%2.2%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out