Needham Market
NMTEast of EnglandManaged by Greater Anglia
How this station is performing
Needham Market had 13,369 scheduled stops to Period 7 of 2026-27, about 37 a day. 88.0% of recorded arrivals were within three minutes of the timetable and 0.7% of scheduled stops were cancelled.
Needham Market opened on 24 December 1846 and closed to passengers on 2 January 1967. It reopened on 6 December 1971, 55 years before the latest figures. Of the 5 stations nearest to it with a known opening date, Needham Market is the oldest; the next oldest, Stowmarket, dates from 1846.
The nearest stations to Needham Market are Stowmarket (5.6 km north-west), Westerfield (11.0 km south-east), Ipswich (12.9 km south-east), Elmswell (13.6 km north-west) and Derby Road (Ipswich) (14.3 km south-east). 1 stations lie within 10 km in all. Of the five, Derby Road (Ipswich) is the most punctual at 94.2% and Elmswell the least at 84.8%, with Needham Market on 88.0%.
Needham Market takes its name from a market town called Needham Market, home to about 4,745 people, and the station stands 0.1 km from its centre.
Compared with 3 stations of a similar size in East of England, Needham Market is the least punctual, at 88.0%. All of them are ahead, including Bricket Wood (95.4%), Garston (Hertfordshire) (96.3%) and How Wood (Hertfordshire) (96.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Greater Anglia | 13,369 | 88.0% | 0.7% |
Operators with their own page for this station are linked to it.
Late train at Needham Market? Delay Repay
These operators call at Needham Market and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,036 | 89.0% | 0.7% |
| Period 6 of 2026-27 | 1,033 | 89.7% | 1.0% |
| Period 5 of 2026-27 | 1,064 | 87.1% | 0.7% |
| Period 4 of 2026-27 | 1,058 | 77.3% | 2.0% |
| Period 3 of 2026-27 | 1,057 | 81.4% | 0.9% |
| Period 2 of 2026-27 | 1,037 | 88.1% | 0.9% |
| Period 1 of 2026-27 | 1,042 | 90.3% | 0.6% |
| Period 13 of 2025-26 | 1,124 | 90.9% | 0.2% |
| Period 12 of 2025-26 | 990 | 90.5% | 0.7% |
| Period 11 of 2025-26 | 1,020 | 87.7% | 1.0% |
| Period 10 of 2025-26 | 931 | 92.2% | 0.0% |
| Period 9 of 2025-26 | 956 | 88.7% | 0.3% |
| Period 8 of 2025-26 | 1,021 | 91.4% | 0.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Bricket Wood | 13,363 | 95.4% | 6.2% |
| Garston (Hertfordshire) | 13,363 | 96.3% | 6.2% |
| How Wood (Hertfordshire) | 13,363 | 96.2% | 6.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out