Nafferton
NFNYorkshire and The HumberManaged by Northern Trains
How this station is performing
Nafferton has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 14,769 scheduled stops, about 41 a day. In those periods 78.0% of stops arrived within three minutes of the timetable and 3.6% of scheduled stops were cancelled.
Nafferton opened on 7 October 1846, 180 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Nafferton is the oldest; the next oldest, Driffield, dates from 1846.
The nearest stations to Nafferton are Driffield (3.4 km west), Hutton Cranswick (6.9 km south-west), Arram (14.4 km south), Bridlington (14.5 km north-east) and Bempton (18.6 km north-east). 2 stations lie within 10 km in all. Of the five, Bridlington is the most punctual at 79.0% and Bempton the least at 67.8%, with Nafferton on 78.0%.
Nafferton is one of 2 stations named after a Village called Nafferton, home to about 2,537 people; this one stands 0.9 km from its centre.
2 of 3 stations of a similar size in Yorkshire and The Humber are more punctual than Nafferton on 78.0%. The comparison group includes Hutton Cranswick (76.4%), Conisbrough (82.3%) and Mexborough (81.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 14,769 | 78.0% | 3.6% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,126 | 76.6% | 2.0% |
| Period 6 of 2026-27 | 1,109 | 79.8% | 3.8% |
| Period 5 of 2026-27 | 1,128 | 81.6% | 6.1% |
| Period 4 of 2026-27 | 1,102 | 76.8% | 4.9% |
| Period 3 of 2026-27 | 1,128 | 75.6% | 3.8% |
| Period 2 of 2026-27 | 1,116 | 74.2% | 2.6% |
| Period 1 of 2026-27 | 1,296 | – | 3.3% |
| Period 13 of 2025-26 | 1,242 | 87.3% | 2.7% |
| Period 12 of 2025-26 | 1,129 | 87.0% | 1.2% |
| Period 11 of 2025-26 | 1,068 | 81.4% | 4.9% |
| Period 10 of 2025-26 | 1,029 | 77.5% | 3.8% |
| Period 9 of 2025-26 | 1,148 | 63.3% | 5.2% |
| Period 8 of 2025-26 | 1,148 | 73.5% | 2.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Hutton Cranswick | 14,758 | 76.4% | 3.5% |
| Conisbrough | 15,107 | 82.3% | 2.7% |
| Mexborough | 15,108 | 81.1% | 2.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out