Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

TransPennine Express at Mytholmroyd

All trains at MytholmroydTransPennine Express across BritainYorkshire and The Humber

On time, last 13 periods61.7%Whole station: 59.5%
Cancelled2.4%Whole station: 2.6%
Scheduled stops1,944Of 26,206 at the station

How this operator is doing here

TransPennine Express had 1,944 scheduled stops at Mytholmroyd in the 13 periods to Period 7 of 2026-27, 7% of the station's total. 61.7% of recorded arrivals came within three minutes and 2.4% of stops were cancelled.

TransPennine Express trains at Mytholmroyd also serve Hebden Bridge (2.0 km north-west, 61.1% on time, 2.3% cancelled), Sowerby Bridge (5.4 km south-east, 60.7% on time, 2.4% cancelled), Todmorden (8.0 km west, 59.4% on time, 2.4% cancelled), Slaithwaite (13.5 km south-east, 64.5% on time, 2.9% cancelled), Brighouse (13.8 km east, 64.7% on time, 3.1% cancelled) and Marsden (Yorks) (14.4 km south, 67.2% on time, 2.8% cancelled), which are the stations on its network closest to Mytholmroyd.

Within 30 km of here, TransPennine Express runs best at Stalybridge, 27.8 km south (69.7%), and worst at Huddersfield, 15.8 km south-east (61.3%).

The busiest TransPennine Express station within 30 km of Mytholmroyd is Leeds, 29.4 km east, with about 141 scheduled stops a day.

Of the 2 operators with enough records at Mytholmroyd, TransPennine Express is the most punctual, at 61.7%.

Cancellations of TransPennine Express at Mytholmroyd are near its usual level: 2.4% of scheduled stops, against 3.3% across its network and 2.6% for every operator at the station.

Period by period

40%60%80%2023-242024-252025-262026-27Period 3 of 2025-26: 72.9%Period 5 of 2025-26: 74.8%Period 10 of 2025-26: 81.0%Period 1 of 2026-27: 47.2%Period 2 of 2026-27: 57.2%Period 3 of 2026-27: 81.9%Period 4 of 2026-27: 43.7%Period 5 of 2026-27: 74.5%Period 6 of 2026-27: 83.1%Period 7 of 2026-27: 50.6%
This pageGreat Britain
0%5%10%15%Period 3 of 2025-26: 2.7%Period 5 of 2025-26: 13.6%Period 10 of 2025-26: 0.0%Period 1 of 2026-27: 3.8%Period 2 of 2026-27: 1.4%Period 3 of 2026-27: 1.8%Period 4 of 2026-27: 8.5%Period 5 of 2026-27: 6.3%Period 6 of 2026-27: 1.2%Period 7 of 2026-27: 1.3%2023-242024-252025-262026-27

See how TransPennine Express Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2739450.6%1.3%
Period 6 of 2026-2716883.1%1.2%
Period 5 of 2026-2717674.5%6.3%
Period 4 of 2026-2713043.7%8.5%
Period 3 of 2026-2722581.9%1.8%
Period 2 of 2026-2766157.2%1.4%
Period 1 of 2026-2713247.2%3.8%
Period 13 of 2025-260––
Period 12 of 2025-260––
Period 11 of 2025-260––
Period 10 of 2025-265881.0%0.0%
Period 9 of 2025-260––
Period 8 of 2025-260––

Other operators at Mytholmroyd

OperatorScheduled stopsWithin 3 minCancelled
Northern24,26259.3%2.6%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out