Northern at Mytholmroyd
All trains at MytholmroydNorthern across BritainYorkshire and The Humber
How this operator is doing here
Northern had 24,262 scheduled stops at Mytholmroyd in the 13 periods to Period 7 of 2026-27, 93% of the station's total. 59.3% of recorded arrivals came within three minutes and 2.6% of stops were cancelled.
Northern trains at Mytholmroyd also serve Hebden Bridge (2.0 km north-west, 60.2% on time, 2.5% cancelled), Sowerby Bridge (5.4 km south-east, 58.5% on time, 2.6% cancelled), Todmorden (8.0 km west, 63.4% on time, 2.8% cancelled), Halifax (8.5 km east, 72.0% on time, 3.7% cancelled), Walsden (8.9 km south-west, 74.8% on time, 2.8% cancelled) and Littleborough (12.2 km south-west, 70.2% on time, 3.0% cancelled), which are the stations on its network closest to Mytholmroyd.
Within 30 km of here, Northern runs best at Bradford Forster Square, 16.8 km north-east (93.3%), and worst at Sowerby Bridge, 5.4 km south-east (58.5%).
The busiest Northern station within 30 km of Mytholmroyd is Leeds, 29.4 km east, with about 780 scheduled stops a day.
Of the 2 operators with enough records at Mytholmroyd, Northern is the least punctual, at 59.3%.
For Northern, Mytholmroyd is the 486th best of 493 ranked stations. Its 59.3% here is 19.3 percentage points below the 78.6% across the whole network.
Over three full railway years Northern at Mytholmroyd has got worse each time, from 62.0% within three minutes in 2023-24 to 61.2% in 2024-25 and 57.7% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,543 | 54.7% | 1.3% |
| Period 6 of 2026-27 | 1,894 | 66.2% | 2.0% |
| Period 5 of 2026-27 | 1,892 | 65.7% | 2.5% |
| Period 4 of 2026-27 | 1,772 | 64.8% | 2.3% |
| Period 3 of 2026-27 | 1,747 | 58.8% | 1.8% |
| Period 2 of 2026-27 | 1,813 | 51.1% | 3.6% |
| Period 1 of 2026-27 | 2,214 | 65.0% | 2.5% |
| Period 13 of 2025-26 | 2,117 | 64.7% | 1.7% |
| Period 12 of 2025-26 | 1,919 | 58.0% | 1.9% |
| Period 11 of 2025-26 | 1,922 | 58.5% | 2.0% |
| Period 10 of 2025-26 | 1,747 | 61.2% | 4.9% |
| Period 9 of 2025-26 | 1,816 | 47.3% | 4.8% |
| Period 8 of 2025-26 | 1,866 | 51.0% | 3.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Mytholmroyd
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 1,944 | 61.7% | 2.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out