Mouldsworth
MLDNorth WestManaged by Northern Trains
How this station is performing
Mouldsworth had 12,898 scheduled stops to Period 7 of 2026-27, about 35 a day. 79.7% of recorded arrivals were within three minutes of the timetable and 2.6% of scheduled stops were cancelled.
Mouldsworth opened on 22 June 1870, 156 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Frodsham is the oldest (1850) and Stanlow and Thornton the newest (1940), with Mouldsworth in between.
The nearest stations to Mouldsworth are Delamere (4.4 km east), Helsby (5.5 km north-west), Frodsham (7.1 km north), Ince and Elton (Cheshire) (7.5 km north-west) and Stanlow and Thornton (8.9 km north-west). 7 stations lie within 10 km in all. Of the five, Ince and Elton (Cheshire) is the most punctual at 93.6% and Helsby the least at 77.2%, with Mouldsworth on 79.7%.
Mouldsworth takes its name from a Village called Mouldsworth, home to about 327 people, and the station stands 0.5 km from its centre.
Across the whole run of data, the weakest four-week period for Mouldsworth was Period 9 of 2023-24, at 63.7%, some time before the latest year. The strongest was Period 1 of 2023-24, at 90.6%, and the two are 26.9 percentage points apart. Cancellations peaked at 14.9% of scheduled stops in Period 10 of 2024-25, against 2.6% over the latest 13 periods.
Compared with 3 stations of a similar size in North West, Mouldsworth is the least punctual, at 79.7%. All of them are ahead, including Lostock Gralam (80.5%), Greenbank (83.0%) and Northwich (83.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 12,898 | 79.7% | 2.6% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 992 | 75.5% | 2.3% |
| Period 6 of 2026-27 | 1,000 | 78.0% | 1.7% |
| Period 5 of 2026-27 | 978 | 77.4% | 1.5% |
| Period 4 of 2026-27 | 992 | 76.9% | 4.0% |
| Period 3 of 2026-27 | 996 | 80.9% | 1.1% |
| Period 2 of 2026-27 | 988 | 82.9% | 0.9% |
| Period 1 of 2026-27 | 1,143 | 84.4% | 4.4% |
| Period 13 of 2025-26 | 1,086 | 86.5% | 1.1% |
| Period 12 of 2025-26 | 848 | 89.4% | 0.9% |
| Period 11 of 2025-26 | 989 | 81.0% | 3.1% |
| Period 10 of 2025-26 | 908 | 69.7% | 6.5% |
| Period 9 of 2025-26 | 990 | 73.7% | 4.4% |
| Period 8 of 2025-26 | 988 | 78.2% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Lostock Gralam | 12,898 | 80.5% | 2.4% |
| Greenbank | 12,905 | 83.0% | 2.4% |
| Northwich | 12,905 | 83.5% | 2.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out