Greenbank
GBKNorth WestManaged by Northern Trains
How this station is performing
Greenbank had 12,905 scheduled stops to Period 7 of 2026-27, about 36 a day. 83.0% of recorded arrivals were within three minutes of the timetable and 2.4% of scheduled stops were cancelled.
Greenbank opened on 22 June 1870, 156 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Greenbank is the newest; the oldest, Hartford (Cheshire), opened in 1837.
The nearest stations to Greenbank are Hartford (Cheshire) (1.7 km south-west), Northwich (2.7 km north-east), Cuddington (4.5 km west), Acton Bridge (Cheshire) (4.8 km west) and Lostock Gralam (4.9 km east). 8 stations lie within 10 km in all. Of the five, Northwich is the most punctual at 83.5% and Acton Bridge (Cheshire) the least at 61.3%, with Greenbank on 83.0%.
Greenbank is one of 4 stations named after a suburb called Greenbank; this one stands 0.1 km from its centre.
Across the whole run of data, the weakest four-week period for Greenbank was Period 9 of 2023-24, at 62.1%, some time before the latest year. The strongest was Period 12 of 2025-26, at 92.0%, and the two are 29.9 percentage points apart. Cancellations peaked at 15.0% of scheduled stops in Period 10 of 2024-25, against 2.4% over the latest 13 periods.
1 of 3 stations of a similar size in North West are more punctual than Greenbank on 83.0%. The comparison group includes Northwich (83.5%), Ashley (80.8%) and Hale (Manchester) (81.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 12,905 | 83.0% | 2.4% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 992 | 82.8% | 2.2% |
| Period 6 of 2026-27 | 1,000 | 84.0% | 1.7% |
| Period 5 of 2026-27 | 978 | 80.7% | 1.5% |
| Period 4 of 2026-27 | 992 | 80.1% | 2.6% |
| Period 3 of 2026-27 | 996 | 84.1% | 1.1% |
| Period 2 of 2026-27 | 988 | 82.4% | 0.9% |
| Period 1 of 2026-27 | 1,143 | 87.0% | 4.2% |
| Period 13 of 2025-26 | 1,086 | 89.5% | 1.1% |
| Period 12 of 2025-26 | 848 | 92.0% | 0.9% |
| Period 11 of 2025-26 | 992 | 81.2% | 3.0% |
| Period 10 of 2025-26 | 908 | 72.9% | 6.3% |
| Period 9 of 2025-26 | 990 | 78.2% | 3.8% |
| Period 8 of 2025-26 | 992 | 82.1% | 2.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northwich | 12,905 | 83.5% | 2.2% |
| Ashley | 12,912 | 80.8% | 2.4% |
| Hale (Manchester) | 12,912 | 81.6% | 2.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out