Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Lostock Gralam

LTGNorth WestManaged by Northern Trains

On time, last 13 periods80.5%Great Britain: 83.6%
Cancelled2.4%Great Britain: 3.2%
Stops a day35Scheduled, on average
Punctuality rank1466th of 2,374Among ranked stations

How this station is performing

Lostock Gralam has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 12,898 scheduled stops, about 35 a day. In those periods 80.5% of stops arrived within three minutes of the timetable and 2.4% of scheduled stops were cancelled.

Lostock Gralam opened on 1 January 1863, 163 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Hartford (Cheshire) is the oldest (1837) and Greenbank the newest (1870), with Lostock Gralam in between.

The nearest stations to Lostock Gralam are Northwich (2.2 km west), Plumley (3.1 km east), Greenbank (4.9 km west), Hartford (Cheshire) (6.6 km south-west) and Knutsford (7.3 km north-east). 8 stations lie within 10 km in all. Of the five, Northwich is the most punctual at 83.5% and Hartford (Cheshire) the least at 62.2%, with Lostock Gralam on 80.5%.

Lostock Gralam takes its name from a Village called Lostock Gralam, home to about 2,718 people, and the station stands 0.2 km from its centre.

2 of 3 stations of a similar size in North West are more punctual than Lostock Gralam on 80.5%. The comparison group includes Mouldsworth (79.7%), Greenbank (83.0%) and Northwich (83.5%).

Period by period

60%70%80%90%2023-242024-252025-262026-27Period 1 of 2023-24: 89.9%Period 2 of 2023-24: 86.6%Period 3 of 2023-24: 77.6%Period 4 of 2023-24: 84.3%Period 5 of 2023-24: 84.3%Period 6 of 2023-24: 86.0%Period 7 of 2023-24: 84.5%Period 8 of 2023-24: 76.7%Period 9 of 2023-24: 62.3%Period 10 of 2023-24: 78.3%Period 11 of 2023-24: 83.2%Period 12 of 2023-24: 85.5%Period 13 of 2023-24: 89.0%Period 1 of 2024-25: 87.2%Period 2 of 2024-25: 85.4%Period 3 of 2024-25: 85.9%Period 4 of 2024-25: 84.4%Period 5 of 2024-25: 87.7%Period 6 of 2024-25: 83.9%Period 7 of 2024-25: 78.6%Period 8 of 2024-25: 76.8%Period 9 of 2024-25: 67.5%Period 11 of 2024-25: 73.5%Period 12 of 2024-25: 88.1%Period 13 of 2024-25: 89.9%Period 1 of 2025-26: 89.3%Period 2 of 2025-26: 83.8%Period 3 of 2025-26: 84.5%Period 4 of 2025-26: 83.0%Period 6 of 2025-26: 86.2%Period 8 of 2025-26: 78.7%Period 9 of 2025-26: 76.0%Period 10 of 2025-26: 68.5%Period 11 of 2025-26: 78.4%Period 12 of 2025-26: 90.6%Period 13 of 2025-26: 88.4%Period 2 of 2026-27: 79.8%Period 3 of 2026-27: 81.3%Period 4 of 2026-27: 78.3%Period 5 of 2026-27: 77.8%Period 6 of 2026-27: 81.9%Period 7 of 2026-27: 81.9%
This pageGreat Britain
0%5%10%15%20%Period 1 of 2023-24: 1.7%Period 2 of 2023-24: 1.3%Period 3 of 2023-24: 3.5%Period 4 of 2023-24: 3.0%Period 5 of 2023-24: 2.3%Period 6 of 2023-24: 2.1%Period 7 of 2023-24: 2.6%Period 8 of 2023-24: 2.2%Period 9 of 2023-24: 3.0%Period 10 of 2023-24: 3.0%Period 11 of 2023-24: 1.4%Period 12 of 2023-24: 2.5%Period 13 of 2023-24: 2.1%Period 1 of 2024-25: 1.3%Period 2 of 2024-25: 3.8%Period 3 of 2024-25: 6.0%Period 4 of 2024-25: 6.1%Period 5 of 2024-25: 5.3%Period 6 of 2024-25: 6.3%Period 7 of 2024-25: 7.7%Period 8 of 2024-25: 10.4%Period 9 of 2024-25: 6.6%Period 10 of 2024-25: 15.2%Period 11 of 2024-25: 3.9%Period 12 of 2024-25: 1.7%Period 13 of 2024-25: 1.6%Period 1 of 2025-26: 1.1%Period 2 of 2025-26: 2.4%Period 3 of 2025-26: 2.5%Period 4 of 2025-26: 3.2%Period 5 of 2025-26: 1.3%Period 6 of 2025-26: 3.4%Period 7 of 2025-26: 2.4%Period 8 of 2025-26: 2.1%Period 9 of 2025-26: 3.8%Period 10 of 2025-26: 6.4%Period 11 of 2025-26: 3.0%Period 12 of 2025-26: 0.9%Period 13 of 2025-26: 1.1%Period 1 of 2026-27: 4.1%Period 2 of 2026-27: 1.0%Period 3 of 2026-27: 1.1%Period 4 of 2026-27: 1.6%Period 5 of 2026-27: 1.6%Period 6 of 2026-27: 1.9%Period 7 of 2026-27: 2.1%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
Northern12,89880.5%2.4%

Operators with their own page for this station are linked to it.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2799281.9%2.1%
Period 6 of 2026-271,00081.9%1.9%
Period 5 of 2026-2797877.8%1.6%
Period 4 of 2026-2799278.3%1.6%
Period 3 of 2026-2799681.3%1.1%
Period 2 of 2026-2798879.8%1.0%
Period 1 of 2026-271,143–4.1%
Period 13 of 2025-261,08688.4%1.1%
Period 12 of 2025-2684890.6%0.9%
Period 11 of 2025-2698978.4%3.0%
Period 10 of 2025-2690868.5%6.4%
Period 9 of 2025-2699076.0%3.8%
Period 8 of 2025-2698878.7%2.1%

Time of year

70%80%90%P1: 88.8%1P2: 84.0%2P3: 82.1%3P4: 82.3%4P5: 83.1%5P6: 84.4%6P7: 81.8%7P8: 77.4%8P9: 68.2%9P10: 73.6%10P11: 78.3%11P12: 88.1%12P13: 89.0%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in North West

StationScheduled stopsWithin 3 minCancelled
Mouldsworth12,89879.7%2.6%
Greenbank12,90583.0%2.4%
Northwich12,90583.5%2.2%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out