West Midlands Railway at Mossley Hill
All trains at Mossley HillWest Midlands Railway across BritainNorth West
How this operator is doing here
West Midlands Railway had 8,749 scheduled stops at Mossley Hill in the 13 periods to Period 7 of 2026-27, 28% of the station's total. 83.9% of recorded arrivals came within three minutes and 4.7% of stops were cancelled.
West Midlands Railway trains at Mossley Hill also serve Liverpool South Parkway (2.9 km south-east, 71.5% on time, 5.1% cancelled), Liverpool Lime Street (5.3 km north-west, 70.9% on time, 6.0% cancelled), Runcorn (12.5 km east, 69.9% on time, 4.0% cancelled), Acton Bridge (Cheshire) (24.2 km south-east, 61.3% on time, 4.4% cancelled), Hartford (Cheshire) (28.4 km south-east, 62.0% on time, 4.3% cancelled) and Winsford (34.9 km south-east, 63.9% on time, 4.4% cancelled), which are the stations on its network closest to Mossley Hill.
Within 30 km of here, West Midlands Railway runs best at Liverpool South Parkway, 2.9 km south-east (71.5%), and worst at Acton Bridge (Cheshire), 24.2 km south-east (61.3%).
The busiest West Midlands Railway station within 30 km of Mossley Hill is Liverpool Lime Street, 5.3 km north-west, with about 58 scheduled stops a day.
West Midlands Railway at Mossley Hill has slipped a little, from 88.5% within three minutes in the previous 13 periods to 83.9% in the latest 13, a fall of 4.6 percentage points. Cancellations held steady at 4.7% of scheduled stops, against 4.3% before.
Period by period
See how West Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 700 | 82.1% | 1.7% |
| Period 6 of 2026-27 | 700 | 84.4% | 2.1% |
| Period 5 of 2026-27 | 700 | 82.3% | 5.0% |
| Period 4 of 2026-27 | 642 | 77.6% | 9.7% |
| Period 3 of 2026-27 | 589 | 83.3% | 2.4% |
| Period 2 of 2026-27 | 627 | 85.8% | 5.7% |
| Period 1 of 2026-27 | 807 | 89.8% | 3.7% |
| Period 13 of 2025-26 | 738 | 85.1% | 6.4% |
| Period 12 of 2025-26 | 692 | 90.3% | 4.3% |
| Period 11 of 2025-26 | 667 | 80.3% | 8.1% |
| Period 10 of 2025-26 | 593 | 83.9% | 5.7% |
| Period 9 of 2025-26 | 642 | 79.6% | 5.5% |
| Period 8 of 2025-26 | 652 | 83.5% | 1.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Mossley Hill
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 22,255 | 77.7% | 3.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out