Northern at Mossley Hill
How this operator is doing here
Northern had 22,255 scheduled stops at Mossley Hill in the 13 periods to Period 7 of 2026-27, 72% of the station's total. 77.7% of recorded arrivals came within three minutes and 3.5% of stops were cancelled.
Northern trains at Mossley Hill also serve West Allerton (1.2 km south-east, 75.3% on time, 3.6% cancelled), Liverpool South Parkway (2.9 km south-east, 70.7% on time, 3.4% cancelled), Wavertree Technology Park (3.0 km north, 80.9% on time, 3.3% cancelled), Broad Green (3.4 km north-east, 79.4% on time, 3.2% cancelled), Edge Hill (3.4 km north-west, 81.0% on time, 3.1% cancelled) and Hunts Cross (4.4 km south-east, 75.7% on time, 3.3% cancelled), which are the stations on its network closest to Mossley Hill.
Within 30 km of here, Northern runs best at Thatto Heath, 12.2 km north-east (90.7%), and worst at Bescar Lane, 27.2 km north (64.9%).
The busiest Northern station within 30 km of Mossley Hill is Liverpool Lime Street, 5.3 km north-west, with about 193 scheduled stops a day.
Of the 2 operators with enough records at Mossley Hill, Northern is the least punctual, at 77.7%.
Northern at Mossley Hill has slipped a little, from 80.3% within three minutes in the previous 13 periods to 77.7% in the latest 13, a fall of 2.6 percentage points. Cancellations fell to 3.5% of scheduled stops from 5.2%, which is 1.7 percentage points fewer.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,708 | 79.4% | 2.1% |
| Period 6 of 2026-27 | 1,712 | 78.8% | 2.2% |
| Period 5 of 2026-27 | 1,712 | 76.9% | 4.9% |
| Period 4 of 2026-27 | 1,674 | 78.3% | 3.8% |
| Period 3 of 2026-27 | 1,547 | 78.0% | 3.2% |
| Period 2 of 2026-27 | 1,673 | 77.9% | 4.0% |
| Period 1 of 2026-27 | 1,976 | 80.0% | 2.8% |
| Period 13 of 2025-26 | 1,867 | 79.4% | 1.7% |
| Period 12 of 2025-26 | 1,713 | 80.8% | 2.1% |
| Period 11 of 2025-26 | 1,705 | 78.5% | 1.8% |
| Period 10 of 2025-26 | 1,549 | 76.3% | 8.8% |
| Period 9 of 2025-26 | 1,712 | 71.1% | 6.1% |
| Period 8 of 2025-26 | 1,707 | 73.2% | 3.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Mossley Hill
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 8,749 | 83.9% | 4.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out