Mortlake
MTLLondonManaged by South Western Railway
How this station is performing
Mortlake had 35,178 scheduled stops to Period 7 of 2026-27, about 97 a day. 89.5% of recorded arrivals were within three minutes of the timetable and 4.0% of scheduled stops were cancelled.
Mortlake opened on 27 July 1846, 180 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Mortlake is the oldest; the next oldest, Barnes, dates from 1846.
The nearest stations to Mortlake are Barnes Bridge (1.1 km north-east), North Sheen (1.4 km west), Chiswick (1.5 km north), Kew Gardens (1.6 km north-west) and Barnes (1.9 km east). 77 stations lie within 10 km in all. At 89.5%, Mortlake is more punctual than every one of them; the best of the five, North Sheen, manages 88.7%.
Mortlake takes its name from an area of London called Mortlake, and the station stands 0.4 km from its centre.
Across the whole run of data, the weakest four-week period for Mortlake was Period 9 of 2024-25, at 69.7%, some time before the latest year. The strongest was Period 5 of 2023-24, at 93.8%, and the two are 24.1 percentage points apart. Cancellations peaked at 8.2% of scheduled stops in Period 2 of 2026-27, against 4.0% over the latest 13 periods.
1 of 3 stations of a similar size in London are more punctual than Mortlake on 89.5%. The comparison group includes North Sheen (88.7%), Hounslow (84.7%) and Whitton (London) (91.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 35,178 | 89.5% | 4.0% |
Operators with their own page for this station are linked to it.
Late train at Mortlake? Delay Repay
These operators call at Mortlake and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,730 | 92.3% | 3.6% |
| Period 6 of 2026-27 | 2,696 | 91.0% | 3.0% |
| Period 5 of 2026-27 | 2,728 | 89.1% | 3.8% |
| Period 4 of 2026-27 | 2,721 | 90.4% | 3.4% |
| Period 3 of 2026-27 | 2,626 | 88.9% | 3.1% |
| Period 2 of 2026-27 | 2,634 | 87.8% | 8.2% |
| Period 1 of 2026-27 | 2,952 | 92.3% | 3.0% |
| Period 13 of 2025-26 | 2,944 | 92.5% | 1.9% |
| Period 12 of 2025-26 | 2,639 | 90.1% | 5.9% |
| Period 11 of 2025-26 | 2,752 | 91.2% | 2.8% |
| Period 10 of 2025-26 | 2,281 | 89.6% | 4.7% |
| Period 9 of 2025-26 | 2,728 | 83.4% | 3.5% |
| Period 8 of 2025-26 | 2,747 | 83.5% | 6.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| North Sheen | 35,170 | 88.7% | 4.0% |
| Hounslow | 35,251 | 84.7% | 3.2% |
| Whitton (London) | 35,355 | 91.1% | 3.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out