LNER at Middlesbrough
On time, last 13 periods–Whole station: 83.1%
Cancelled–Whole station: 3.0%
Scheduled stops498Of 61,263 at the station
How this operator is doing here
There are not enough usable records of LNER at Middlesbrough to report how punctual it is.
Period by period
See how LNER Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 37 | – | – |
| Period 6 of 2026-27 | 39 | – | – |
| Period 5 of 2026-27 | 40 | – | – |
| Period 4 of 2026-27 | 40 | – | – |
| Period 3 of 2026-27 | 34 | – | – |
| Period 2 of 2026-27 | 35 | – | – |
| Period 1 of 2026-27 | 46 | – | – |
| Period 13 of 2025-26 | 44 | – | – |
| Period 12 of 2025-26 | 40 | – | – |
| Period 11 of 2025-26 | 40 | – | – |
| Period 10 of 2025-26 | 31 | – | – |
| Period 9 of 2025-26 | 35 | – | – |
| Period 8 of 2025-26 | 37 | – | – |
Other operators at Middlesbrough
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 48,648 | 85.6% | 2.2% |
| TransPennine Express | 12,117 | 72.8% | 6.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out