TransPennine Express at Manchester Oxford Road
All trains at Manchester Oxford RoadTransPennine Express across BritainNorth West
How this operator is doing here
TransPennine Express had 34,377 scheduled stops at Manchester Oxford Road in the 13 periods to Period 7 of 2026-27, 27% of the station's total. 53.6% of recorded arrivals came within three minutes and 3.9% of stops were cancelled.
TransPennine Express trains at Manchester Oxford Road also serve Deansgate (0.6 km west, – on time, – cancelled), Manchester Piccadilly (0.9 km north-east, 65.8% on time, 3.5% cancelled), Manchester Victoria (1.6 km north, 69.2% on time, 2.8% cancelled), Salford Crescent (2.6 km north-west, – on time, – cancelled), Urmston (7.9 km west, 54.1% on time, 7.4% cancelled) and Guide Bridge (8.6 km east, – on time, – cancelled), which are the stations on its network closest to Manchester Oxford Road.
Within 30 km of here, TransPennine Express runs best at Manchester Airport, 12.3 km south (77.8%), and worst at Irlam, 13.4 km west (53.8%).
The busiest TransPennine Express station within 30 km of Manchester Oxford Road is Manchester Piccadilly, 0.9 km north-east, with about 152 scheduled stops a day.
TransPennine Express at Manchester Oxford Road has slipped a little, from 57.6% within three minutes in the previous 13 periods to 53.6% in the latest 13, a fall of 4.0 percentage points. Cancellations held steady at 3.9% of scheduled stops, against 4.0% before.
Period by period
See how TransPennine Express Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,457 | 55.1% | 3.3% |
| Period 6 of 2026-27 | 2,800 | 56.0% | 3.4% |
| Period 5 of 2026-27 | 2,601 | 54.1% | 6.5% |
| Period 4 of 2026-27 | 2,624 | 52.5% | 4.7% |
| Period 3 of 2026-27 | 2,812 | 52.0% | 4.7% |
| Period 2 of 2026-27 | 2,247 | 59.2% | 4.1% |
| Period 1 of 2026-27 | 3,192 | 59.3% | 3.8% |
| Period 13 of 2025-26 | 3,002 | 60.1% | 2.8% |
| Period 12 of 2025-26 | 2,243 | 58.3% | 2.3% |
| Period 11 of 2025-26 | 2,678 | 52.6% | 2.4% |
| Period 10 of 2025-26 | 2,520 | 49.2% | 3.7% |
| Period 9 of 2025-26 | 2,704 | 38.8% | 4.3% |
| Period 8 of 2025-26 | 2,497 | 48.1% | 4.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Manchester Oxford Road
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 71,854 | 56.2% | 3.3% |
| Transport for Wales | 13,274 | 63.7% | 1.8% |
| East Midlands Railway | 9,575 | 44.8% | 4.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out