Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Long Preston

LPRYorkshire and The HumberManaged by Northern Trains

On time, last 13 periods80.4%Great Britain: 83.6%
Cancelled0.9%Great Britain: 3.2%
Stops a day28Scheduled, on average
Punctuality rank1474th of 2,374Among ranked stations

How this station is performing

Long Preston has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 10,235 scheduled stops, about 28 a day. In those periods 80.4% of stops arrived within three minutes of the timetable and 0.9% of scheduled stops were cancelled.

Long Preston opened on 30 July 1849, 177 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Long Preston is the oldest; the next oldest, Hellifield, dates from 1849.

The nearest stations to Long Preston are Hellifield (2.0 km east), Settle (5.8 km north), Giggleswick (5.9 km north-west), Gargrave (10.7 km south-east) and Clapham (North Yorkshire) (14.1 km north-west). 3 stations lie within 10 km in all. Of the five, Giggleswick is the most punctual at 82.2% and Settle the least at 76.4%, with Long Preston on 80.4%.

Long Preston takes its name from a Village called Long Preston, home to about 742 people, and the station stands 0.2 km from its centre.

Compared with 3 stations of a similar size in Yorkshire and The Humber, Long Preston is the most punctual, at 80.4%. The comparison group includes Bempton (67.8%), Gargrave (79.1%) and Filey (80.0%).

Period by period

60%80%2023-242024-252025-262026-27Period 1 of 2023-24: 86.4%Period 2 of 2023-24: 84.9%Period 3 of 2023-24: 81.5%Period 4 of 2023-24: 82.6%Period 5 of 2023-24: 78.5%Period 6 of 2023-24: 83.7%Period 7 of 2023-24: 77.9%Period 8 of 2023-24: 64.7%Period 9 of 2023-24: 62.1%Period 10 of 2023-24: 79.4%Period 11 of 2023-24: 76.0%Period 12 of 2023-24: 79.0%Period 13 of 2023-24: 87.1%Period 1 of 2024-25: 86.5%Period 2 of 2024-25: 79.2%Period 3 of 2024-25: 75.3%Period 4 of 2024-25: 73.9%Period 5 of 2024-25: 75.7%Period 6 of 2024-25: 77.1%Period 7 of 2024-25: 66.3%Period 8 of 2024-25: 55.7%Period 9 of 2024-25: 71.5%Period 11 of 2024-25: 81.5%Period 12 of 2024-25: 87.6%Period 13 of 2024-25: 89.9%Period 1 of 2025-26: 85.7%Period 2 of 2025-26: 84.4%Period 3 of 2025-26: 81.3%Period 4 of 2025-26: 82.2%Period 5 of 2025-26: 77.6%Period 6 of 2025-26: 83.2%Period 7 of 2025-26: 78.4%Period 8 of 2025-26: 65.1%Period 9 of 2025-26: 71.2%Period 10 of 2025-26: 79.0%Period 11 of 2025-26: 85.1%Period 12 of 2025-26: 86.7%Period 13 of 2025-26: 88.9%Period 2 of 2026-27: 79.8%Period 3 of 2026-27: 81.4%Period 4 of 2026-27: 81.4%Period 5 of 2026-27: 84.0%Period 6 of 2026-27: 81.2%Period 7 of 2026-27: 79.6%
This pageGreat Britain
0%2%4%6%8%Period 1 of 2023-24: 0.6%Period 2 of 2023-24: 3.1%Period 3 of 2023-24: 3.4%Period 4 of 2023-24: 3.9%Period 5 of 2023-24: 4.8%Period 6 of 2023-24: 0.6%Period 7 of 2023-24: 1.3%Period 8 of 2023-24: 2.9%Period 9 of 2023-24: 7.1%Period 10 of 2023-24: 4.5%Period 11 of 2023-24: 5.5%Period 12 of 2023-24: 0.9%Period 13 of 2023-24: 0.7%Period 1 of 2024-25: 0.6%Period 2 of 2024-25: 3.8%Period 3 of 2024-25: 3.3%Period 4 of 2024-25: 4.5%Period 5 of 2024-25: 2.0%Period 6 of 2024-25: 4.1%Period 7 of 2024-25: 2.8%Period 8 of 2024-25: 1.5%Period 9 of 2024-25: 3.1%Period 10 of 2024-25: 2.5%Period 11 of 2024-25: 3.4%Period 12 of 2024-25: 0.4%Period 13 of 2024-25: 1.0%Period 1 of 2025-26: 0.7%Period 2 of 2025-26: 1.8%Period 3 of 2025-26: 1.7%Period 4 of 2025-26: 1.1%Period 5 of 2025-26: 2.0%Period 6 of 2025-26: 0.4%Period 7 of 2025-26: 1.0%Period 8 of 2025-26: 0.6%Period 9 of 2025-26: 1.7%Period 10 of 2025-26: 0.9%Period 11 of 2025-26: 1.8%Period 12 of 2025-26: 0.9%Period 13 of 2025-26: 1.2%Period 1 of 2026-27: 0.3%Period 2 of 2026-27: 1.4%Period 3 of 2026-27: 0.4%Period 4 of 2026-27: 1.3%Period 5 of 2026-27: 0.6%Period 6 of 2026-27: 0.3%Period 7 of 2026-27: 0.5%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
Northern10,23580.4%0.9%

Operators with their own page for this station are linked to it.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2778479.6%0.5%
Period 6 of 2026-2778481.2%0.3%
Period 5 of 2026-2778484.0%0.6%
Period 4 of 2026-2778481.4%1.3%
Period 3 of 2026-2778481.4%0.4%
Period 2 of 2026-2778479.8%1.4%
Period 1 of 2026-27868–0.3%
Period 13 of 2025-2686088.9%1.2%
Period 12 of 2025-2678486.7%0.9%
Period 11 of 2025-2678485.1%1.8%
Period 10 of 2025-2666779.0%0.9%
Period 9 of 2025-2678471.2%1.7%
Period 8 of 2025-2678465.1%0.6%

Time of year

60%70%80%90%P1: 86.2%1P2: 82.1%2P3: 79.9%3P4: 79.9%4P5: 79.1%5P6: 81.2%6P7: 75.6%7P8: 61.6%8P9: 68.5%9P10: 79.2%10P11: 81.2%11P12: 84.8%12P13: 88.7%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in Yorkshire and The Humber

StationScheduled stopsWithin 3 minCancelled
Bempton10,50967.8%3.2%
Gargrave10,59379.1%0.9%
Filey10,82480.0%3.7%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out