Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Bempton

BEMYorkshire and The HumberManaged by Northern Trains

On time, last 13 periods67.8%Great Britain: 83.6%
Cancelled3.2%Great Britain: 3.2%
Stops a day29Scheduled, on average
Punctuality rank2205th of 2,374Among ranked stations

How this station is performing

Bempton has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 10,509 scheduled stops, about 29 a day. In those periods 67.8% of stops arrived within three minutes of the timetable and 3.2% of scheduled stops were cancelled.

Bempton opened on 20 October 1847, 179 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Bempton is the newest; the oldest, Seamer, opened in 1845.

The nearest stations to Bempton are Bridlington (5.0 km south), Hunmanby (10.1 km north-west), Filey (11.7 km north-west), Nafferton (18.6 km south-west) and Seamer (19.8 km north-west). 1 stations lie within 10 km in all. At 67.8%, Bempton is less punctual than all of them; the best of the five, Seamer, manages 82.0%.

Bempton takes its name from a Village called Bempton, home to about 1,050 people, and the station stands 0.5 km from its centre.

Bempton has slipped sharply. 67.8% of stops came within three minutes of the timetable in the latest 13 periods, 10.7 percentage points worse than the 78.5% recorded in the 13 before. Cancellations held steady at 3.2% of scheduled stops, against 3.6% before.

Compared with 3 stations of a similar size in Yorkshire and The Humber, Bempton is the least punctual, at 67.8%. All of them are ahead, including Gargrave (79.1%), Long Preston (80.4%) and Filey (80.0%).

Period by period

60%70%80%90%2023-242024-252025-262026-27Period 13 of 2023-24: 89.9%Period 1 of 2024-25: 86.7%Period 2 of 2024-25: 81.8%Period 3 of 2024-25: 81.8%Period 4 of 2024-25: 78.0%Period 5 of 2024-25: 78.9%Period 6 of 2024-25: 79.5%Period 7 of 2024-25: 82.3%Period 8 of 2024-25: 65.8%Period 9 of 2024-25: 65.5%Period 11 of 2024-25: 71.7%Period 12 of 2024-25: 87.3%Period 13 of 2024-25: 87.0%Period 1 of 2025-26: 83.9%Period 2 of 2025-26: 81.6%Period 3 of 2025-26: 84.6%Period 4 of 2025-26: 79.5%Period 5 of 2025-26: 73.9%Period 6 of 2025-26: 80.7%Period 7 of 2025-26: 77.9%Period 8 of 2025-26: 72.1%Period 9 of 2025-26: 61.2%Period 10 of 2025-26: 74.9%Period 11 of 2025-26: 78.8%Period 12 of 2025-26: 77.0%Period 13 of 2025-26: 80.5%Period 2 of 2026-27: 61.2%Period 3 of 2026-27: 62.5%Period 4 of 2026-27: 58.9%Period 5 of 2026-27: 63.3%Period 6 of 2026-27: 57.4%Period 7 of 2026-27: 62.1%
This pageGreat Britain
0%5%10%15%Period 1 of 2023-24: 6.5%Period 2 of 2023-24: 5.6%Period 3 of 2023-24: 4.4%Period 4 of 2023-24: 6.2%Period 5 of 2023-24: 7.4%Period 6 of 2023-24: 7.1%Period 7 of 2023-24: 5.9%Period 8 of 2023-24: 14.7%Period 9 of 2023-24: 6.9%Period 10 of 2023-24: 5.0%Period 11 of 2023-24: 2.9%Period 12 of 2023-24: 1.5%Period 13 of 2023-24: 2.0%Period 1 of 2024-25: 2.0%Period 2 of 2024-25: 7.0%Period 3 of 2024-25: 7.9%Period 4 of 2024-25: 5.6%Period 5 of 2024-25: 3.4%Period 6 of 2024-25: 5.3%Period 7 of 2024-25: 6.6%Period 8 of 2024-25: 7.0%Period 9 of 2024-25: 6.4%Period 10 of 2024-25: 6.0%Period 11 of 2024-25: 4.4%Period 12 of 2024-25: 4.8%Period 13 of 2024-25: 2.3%Period 1 of 2025-26: 3.5%Period 2 of 2025-26: 2.0%Period 3 of 2025-26: 2.5%Period 4 of 2025-26: 1.7%Period 5 of 2025-26: 2.9%Period 6 of 2025-26: 2.1%Period 7 of 2025-26: 1.9%Period 8 of 2025-26: 0.4%Period 9 of 2025-26: 7.3%Period 10 of 2025-26: 5.5%Period 11 of 2025-26: 4.3%Period 12 of 2025-26: 1.2%Period 13 of 2025-26: 1.9%Period 1 of 2026-27: 1.9%Period 2 of 2026-27: 2.1%Period 3 of 2026-27: 3.0%Period 4 of 2026-27: 4.5%Period 5 of 2026-27: 5.9%Period 6 of 2026-27: 3.0%Period 7 of 2026-27: 1.6%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
Northern10,50967.8%3.2%

Operators with their own page for this station are linked to it.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2780562.1%1.6%
Period 6 of 2026-2773857.4%3.0%
Period 5 of 2026-2780863.3%5.9%
Period 4 of 2026-2778258.9%4.5%
Period 3 of 2026-2780862.5%3.0%
Period 2 of 2026-2780861.2%2.1%
Period 1 of 2026-27928–1.9%
Period 13 of 2025-2689080.5%1.9%
Period 12 of 2025-2680877.0%1.2%
Period 11 of 2025-2678478.8%4.3%
Period 10 of 2025-2674274.9%5.5%
Period 9 of 2025-2680461.2%7.3%
Period 8 of 2025-2680472.1%0.4%

Time of year

60%70%80%90%P1: 85.3%1P2: 75.3%2P3: 76.2%3P4: 72.0%4P5: 72.0%5P6: 72.8%6P7: 74.0%7P8: 69.1%8P9: 63.3%910P11: 75.4%11P12: 82.0%12P13: 85.6%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in Yorkshire and The Humber

StationScheduled stopsWithin 3 minCancelled
Gargrave10,59379.1%0.9%
Long Preston10,23580.4%0.9%
Filey10,82480.0%3.7%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out