GTR at London Victoria
How this operator is doing here
GTR had 251,969 scheduled stops at London Victoria in the 13 periods to Period 7 of 2026-27, 65% of the station's total. 83.0% of recorded arrivals came within three minutes and 3.1% of stops were cancelled.
GTR trains at London Victoria also serve Battersea Park (1.9 km south, 94.1% on time, 2.8% cancelled), Elephant and Castle (3.2 km east, 85.6% on time, 5.8% cancelled), London Blackfriars (3.4 km north-east, 80.4% on time, 5.4% cancelled), Imperial Wharf (3.4 km south-west, 89.6% on time, 4.0% cancelled), West Brompton (3.6 km west, 89.5% on time, 4.1% cancelled) and City Thameslink (3.6 km north-east, 77.2% on time, 5.8% cancelled), which are the stations on its network closest to London Victoria.
Within 30 km of here, GTR runs best at Birkbeck, 11.8 km south-east (98.1%), and worst at Kenley, 19.2 km south (66.9%).
The busiest GTR station within 30 km of London Victoria is East Croydon, 13.7 km south, with about 813 scheduled stops a day.
GTR at London Victoria has slipped a little, from 86.9% within three minutes in the previous 13 periods to 83.0% in the latest 13, a fall of 3.9 percentage points. Cancellations rose to 3.1% of scheduled stops from 1.9%, which is 1.2 percentage points more.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 18,952 | 78.9% | 5.3% |
| Period 6 of 2026-27 | 18,887 | 76.3% | 2.9% |
| Period 5 of 2026-27 | 19,003 | 76.9% | 4.3% |
| Period 4 of 2026-27 | 19,692 | 81.8% | 2.9% |
| Period 3 of 2026-27 | 19,592 | 83.8% | 3.0% |
| Period 2 of 2026-27 | 19,224 | 86.7% | 2.4% |
| Period 1 of 2026-27 | 21,152 | 89.7% | 1.5% |
| Period 13 of 2025-26 | 21,549 | 88.8% | 2.7% |
| Period 12 of 2025-26 | 19,093 | 86.4% | 2.3% |
| Period 11 of 2025-26 | 18,635 | 85.3% | 2.0% |
| Period 10 of 2025-26 | 17,739 | 81.9% | 2.4% |
| Period 9 of 2025-26 | 19,514 | 78.9% | 2.9% |
| Period 8 of 2025-26 | 18,937 | 81.8% | 5.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at London Victoria
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 133,319 | 82.1% | 1.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out