Southeastern at London St Pancras International
All trains at London St Pancras InternationalSoutheastern across BritainLondon
How this operator is doing here
Southeastern had 49,928 scheduled stops at London St Pancras International in the 13 periods to Period 7 of 2026-27, 17% of the station's total. 77.9% of recorded arrivals came within three minutes and 1.6% of stops were cancelled.
Southeastern trains at London St Pancras International also serve London Charing Cross (2.8 km south, 84.9% on time, 2.4% cancelled), London Blackfriars (2.9 km south-east, 86.9% on time, 2.9% cancelled), London Waterloo East (3.4 km south-east, 85.8% on time, 2.4% cancelled), London Cannon Street (3.5 km south-east, 89.3% on time, 1.6% cancelled), London Bridge (4.2 km south-east, 82.8% on time, 1.6% cancelled) and London Victoria (4.4 km south, 82.1% on time, 1.4% cancelled), which are the stations on its network closest to London St Pancras International.
Within 30 km of here, Southeastern runs best at Sundridge Park, 16.7 km south-east (99.4%), and worst at Stratford International, 8.3 km east (79.8%).
The busiest Southeastern station within 30 km of London St Pancras International is London Bridge, 4.2 km south-east, with about 912 scheduled stops a day.
Southeastern at London St Pancras International has slipped sharply. 77.9% of stops came within three minutes of the timetable in the latest 13 periods, 6.1 percentage points worse than the 84.0% recorded in the 13 before. Cancellations held steady at 1.6% of scheduled stops, against 1.7% before.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,895 | 73.0% | 1.6% |
| Period 6 of 2026-27 | 3,826 | 69.8% | 3.5% |
| Period 5 of 2026-27 | 3,892 | 70.1% | 1.4% |
| Period 4 of 2026-27 | 3,894 | 73.9% | 1.5% |
| Period 3 of 2026-27 | 3,867 | 68.5% | 2.2% |
| Period 2 of 2026-27 | 3,789 | 74.7% | 3.0% |
| Period 1 of 2026-27 | 4,312 | 84.7% | 0.9% |
| Period 13 of 2025-26 | 4,236 | 83.8% | 2.0% |
| Period 12 of 2025-26 | 3,805 | 83.8% | 0.7% |
| Period 11 of 2025-26 | 3,844 | 85.2% | 0.9% |
| Period 10 of 2025-26 | 3,150 | 82.5% | 0.9% |
| Period 9 of 2025-26 | 3,691 | 81.9% | 0.6% |
| Period 8 of 2025-26 | 3,727 | 80.5% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at London St Pancras International
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 181,440 | 80.0% | 5.7% |
| East Midlands Railway | 65,791 | 70.5% | 4.8% |
| Hull Trains | 44 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out