GTR at London St Pancras International
All trains at London St Pancras InternationalGTR across BritainLondon
How this operator is doing here
GTR had 181,440 scheduled stops at London St Pancras International in the 13 periods to Period 7 of 2026-27, 61% of the station's total. 80.0% of recorded arrivals came within three minutes and 5.7% of stops were cancelled.
GTR trains at London St Pancras International also serve London Kings Cross (0.3 km east, 79.9% on time, 6.9% cancelled), Farringdon (2.1 km south-east, 79.6% on time, 5.9% cancelled), Kentish Town (2.1 km north-west, 83.3% on time, 6.8% cancelled), Highbury and Islington (2.2 km north-east, 90.2% on time, 5.0% cancelled), Essex Road (2.3 km north-east, 91.8% on time, 4.9% cancelled) and City Thameslink (2.5 km south-east, 77.2% on time, 5.8% cancelled), which are the stations on its network closest to London St Pancras International.
Within 30 km of here, GTR runs best at Birkbeck, 15.1 km south (98.1%), and worst at Kenley, 23.2 km south (66.9%).
The busiest GTR station within 30 km of London St Pancras International is East Croydon, 17.6 km south, with about 813 scheduled stops a day.
Of the 3 operators with enough records at London St Pancras International, GTR is the most punctual, at 80.0%.
Over three full railway years GTR at London St Pancras International has improved each time, from 72.7% within three minutes in 2023-24 to 78.3% in 2024-25 and 81.0% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 14,519 | 75.1% | 3.5% |
| Period 6 of 2026-27 | 14,079 | 73.5% | 7.1% |
| Period 5 of 2026-27 | 13,584 | 74.9% | 7.7% |
| Period 4 of 2026-27 | 14,146 | 76.8% | 6.6% |
| Period 3 of 2026-27 | 11,572 | 79.0% | 5.3% |
| Period 2 of 2026-27 | 13,181 | 84.7% | 4.6% |
| Period 1 of 2026-27 | 15,930 | 86.4% | 4.3% |
| Period 13 of 2025-26 | 15,743 | 86.1% | 2.9% |
| Period 12 of 2025-26 | 14,338 | 83.5% | 5.9% |
| Period 11 of 2025-26 | 13,881 | 80.8% | 5.3% |
| Period 10 of 2025-26 | 11,757 | 82.2% | 7.1% |
| Period 9 of 2025-26 | 14,370 | 76.3% | 10.1% |
| Period 8 of 2025-26 | 14,340 | 78.8% | 4.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at London St Pancras International
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 65,791 | 70.5% | 4.8% |
| Southeastern | 49,928 | 77.9% | 1.6% |
| Hull Trains | 44 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out