London Road (Brighton)
LRBSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
London Road (Brighton) had 38,212 scheduled stops to Period 7 of 2026-27, about 105 a day. 91.4% of recorded arrivals were within three minutes of the timetable and 1.7% of scheduled stops were cancelled.
London Road (Brighton) opened on 1 October 1877, 149 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Brighton is the oldest (1840) and Moulsecoomb the newest (1980), with London Road (Brighton) in between.
The nearest stations to London Road (Brighton) are Brighton (0.9 km south), Preston Park (1.6 km north-west), Moulsecoomb (1.6 km north-east), Hove (2.4 km west) and Aldrington (3.2 km west). 11 stations lie within 10 km in all. At 91.4%, London Road (Brighton) is more punctual than every one of them; the best of the five, Moulsecoomb, manages 91.0%.
For London Road (Brighton), the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 74.4% of stops arrived within three minutes of the timetable. The strongest was Period 3 of 2023-24, at 96.9%, which is 22.5 percentage points higher. Cancellations peaked at 5.2% of scheduled stops in Period 8 of 2023-24, against 1.7% over the latest 13 periods.
1 of 3 stations of a similar size in South East are more punctual than London Road (Brighton) on 91.4%. The comparison group includes London Road (Guildford) (86.8%), Ewell East (91.7%) and Effingham Junction (85.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 38,212 | 91.4% | 1.7% |
Operators with their own page for this station are linked to it.
Late train at London Road (Brighton)? Delay Repay
These operators call at London Road (Brighton) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,952 | 90.1% | 2.1% |
| Period 6 of 2026-27 | 2,951 | 74.4% | 1.1% |
| Period 5 of 2026-27 | 2,437 | 86.8% | 2.2% |
| Period 4 of 2026-27 | 2,957 | 94.1% | 2.4% |
| Period 3 of 2026-27 | 2,888 | 93.2% | 2.6% |
| Period 2 of 2026-27 | 2,886 | 92.5% | 3.7% |
| Period 1 of 2026-27 | 3,403 | 90.0% | 2.0% |
| Period 13 of 2025-26 | 3,242 | 95.8% | 1.0% |
| Period 12 of 2025-26 | 2,958 | 95.1% | 1.0% |
| Period 11 of 2025-26 | 2,964 | 94.6% | 1.1% |
| Period 10 of 2025-26 | 2,633 | 94.7% | 0.8% |
| Period 9 of 2025-26 | 2,964 | 94.1% | 0.9% |
| Period 8 of 2025-26 | 2,977 | 92.1% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Road (Guildford) | 38,174 | 86.8% | 3.3% |
| Ewell East | 38,268 | 91.7% | 2.8% |
| Effingham Junction | 38,383 | 85.0% | 2.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out