GTR at London Kings Cross
How this operator is doing here
GTR had 65,445 scheduled stops at London Kings Cross in the 13 periods to Period 7 of 2026-27, 46% of the station's total. 79.9% of recorded arrivals came within three minutes and 6.9% of stops were cancelled.
GTR trains at London Kings Cross also serve London St Pancras International (0.3 km west, 80.0% on time, 5.7% cancelled), Farringdon (1.9 km south-east, 79.6% on time, 5.9% cancelled), Highbury and Islington (2.1 km north-east, 90.2% on time, 5.0% cancelled), Essex Road (2.1 km north-east, 91.8% on time, 4.9% cancelled), Kentish Town (2.3 km north-west, 83.3% on time, 6.8% cancelled) and City Thameslink (2.3 km south-east, 77.2% on time, 5.8% cancelled), which are the stations on its network closest to London Kings Cross.
Within 30 km of here, GTR runs best at Birkbeck, 15.0 km south (98.1%), and worst at Kenley, 23.2 km south (66.9%).
The busiest GTR station within 30 km of London Kings Cross is East Croydon, 17.5 km south, with about 813 scheduled stops a day.
Of the 5 operators with enough records at London Kings Cross, GTR is the most punctual, at 79.9%.
For GTR, London Kings Cross is the 209th best of 307 ranked stations. Its 79.9% here is 3.0 percentage points below the 82.9% across the whole network.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,008 | 70.1% | 5.7% |
| Period 6 of 2026-27 | 4,842 | 72.1% | 15.9% |
| Period 5 of 2026-27 | 4,958 | 78.2% | 9.0% |
| Period 4 of 2026-27 | 5,004 | 74.2% | 12.3% |
| Period 3 of 2026-27 | 5,153 | 84.7% | 8.7% |
| Period 2 of 2026-27 | 5,599 | 84.4% | 6.8% |
| Period 1 of 2026-27 | 5,919 | 84.6% | 5.8% |
| Period 13 of 2025-26 | 5,544 | 83.8% | 3.8% |
| Period 12 of 2025-26 | 4,540 | 83.8% | 4.1% |
| Period 11 of 2025-26 | 5,082 | 80.7% | 4.3% |
| Period 10 of 2025-26 | 4,106 | 82.3% | 3.5% |
| Period 9 of 2025-26 | 4,788 | 77.1% | 6.1% |
| Period 8 of 2025-26 | 4,902 | 79.8% | 4.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at London Kings Cross
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| LNER | 62,896 | 75.6% | 3.2% |
| Grand Central | 6,834 | 66.5% | 3.1% |
| Hull Trains | 4,855 | 73.1% | 1.1% |
| Lumo (East Coast) | 3,751 | 73.3% | 1.2% |
| Caledonian Sleeper | 20 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out