Grand Central at London Kings Cross
All trains at London Kings CrossGrand Central across BritainLondon
How this operator is doing here
Grand Central had 6,834 scheduled stops at London Kings Cross in the 13 periods to Period 7 of 2026-27, 5% of the station's total. 66.5% of recorded arrivals came within three minutes and 3.1% of stops were cancelled.
Grand Central trains at London Kings Cross also serve Welwyn Garden City (30.4 km north, – on time, – cancelled), Stevenage (41.5 km north, – on time, – cancelled), Hitchin (47.7 km north, – on time, – cancelled), Biggleswade (62.2 km north, – on time, – cancelled), Sandy (66.8 km north, – on time, – cancelled) and Huntingdon (88.7 km north, – on time, – cancelled), which are the stations on its network closest to London Kings Cross.
Of the 5 operators with enough records at London Kings Cross, Grand Central is the least punctual, at 66.5%.
For Grand Central, London Kings Cross is the 3rd best of 17 ranked stations. Its 66.5% here is 4.3 percentage points above the 62.2% across the whole network.
Cancellations of Grand Central at London Kings Cross are near its usual level: 3.1% of scheduled stops, against 2.3% across its network and 4.8% for every operator at the station.
Grand Central at London Kings Cross has not moved in one direction over three full railway years: 67.8% within three minutes in 2023-24, 67.4% in 2024-25 and 68.4% in 2025-26.
Period by period
See how Grand Central Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 547 | 67.0% | 4.2% |
| Period 6 of 2026-27 | 534 | 63.1% | 2.6% |
| Period 5 of 2026-27 | 552 | 59.4% | 5.4% |
| Period 4 of 2026-27 | 551 | 64.8% | 3.1% |
| Period 3 of 2026-27 | 552 | 66.4% | 4.2% |
| Period 2 of 2026-27 | 493 | 64.0% | 2.6% |
| Period 1 of 2026-27 | 619 | 67.6% | 1.8% |
| Period 13 of 2025-26 | 554 | 74.0% | 0.9% |
| Period 12 of 2025-26 | 434 | 67.1% | 2.1% |
| Period 11 of 2025-26 | 531 | 69.9% | 4.3% |
| Period 10 of 2025-26 | 478 | 66.7% | 1.9% |
| Period 9 of 2025-26 | 501 | 63.1% | 5.8% |
| Period 8 of 2025-26 | 488 | 71.5% | 1.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at London Kings Cross
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 65,445 | 79.9% | 6.9% |
| LNER | 62,896 | 75.6% | 3.2% |
| Hull Trains | 4,855 | 73.1% | 1.1% |
| Lumo (East Coast) | 3,751 | 73.3% | 1.2% |
| Caledonian Sleeper | 20 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out